- Page 1 and 2: April 2009UCR Project Number: 95633
- Page 5 and 6: Capital AND PHYSICAL PLANNINGTim Ra
- Page 8 and 9: PROJECT SCOPEThe Glen Mor 2 project
- Page 10 and 11: 1.3TheDETAILED PROJECT PROGRAM PROC
- Page 12 and 13: THE APPROACHTo initiate the work, a
- Page 14 and 15: 1.4PROJECTGOALSThe following projec
- Page 16 and 17: 1.X 2.1CAMPUS PLANNING PRINCIPLESTh
- Page 18 and 19: 2007 campus design guidelinesA guid
- Page 20 and 21: 2008 Strategic Plan for STUDENT Hou
- Page 22 and 23: 1.X 2.2SITEANALYSISThe Glen Mor 2 p
- Page 24 and 25: Site ConstraintsEach perimeter zone
- Page 26 and 27: TopographyThe dominant natural feat
- Page 28 and 29: 7108117.8.9.View from northeast cor
- Page 30 and 31: Land useLand use analysis during th
- Page 35 and 36: LEGENDHousingCommunity SpaceCircula
- Page 37 and 38: Landscape designThe Glen Mor 2 Hous
- Page 39 and 40: SUMMARY CONCEPT38UNIVERSITY OF CALI
- Page 41 and 42: Program summaryPROGRAM SUMMARYCode
- Page 43 and 44: esidential RSO 1.88%support 1.21%92
- Page 45 and 46: Glen mor 1 apartment Unit plans4 be
- Page 47 and 48: Glen mor 2 apartment Unit type B pl
- Page 49 and 50: PROGRAM SUMMARY48UNIVERSITY OF CALI
- Page 51: code APT-2GENERALEQUIPMENTSPACE NAM
- Page 54 and 55: code APT-RDGENERALEQUIPMENTSPACE NA
- Page 56 and 57: code CL-1GENERALSPACE NAMEComputer
- Page 58 and 59: DIAGRAMPROGRAMUNIVERSITY OF CALIFOR
- Page 60 and 61: DIAGRAMPROGRAMUNIVERSITY OF CALIFOR
- Page 62 and 63: Code CR-4GENERALEQUIPMENTSPACE NAME
- Page 64 and 65: Code F-2GENERALEQUIPMENTSPACE NAMEM
- Page 66 and 67: code HS-1GENERALEQUIPMENTSPACE NAME
- Page 68 and 69: code MP-1GENERALEQUIPMENTSPACE NAME
- Page 70 and 71: Code MR-2GENERALEQUIPMENTSPACE NAME
- Page 72 and 73: Code PO-1GENERALEQUIPMENTSPACE NAME
- Page 74 and 75: code PO-3GENERALEQUIPMENTSPACE NAME
- Page 76 and 77: Code RC-1GENERALEQUIPMENTSPACE NAME
- Page 78 and 79: code RR-2GENERALEQUIPMENTSPACE NAME
- Page 80 and 81: code ST-1GENERALEQUIPMENTSPACE NAME
- Page 82 and 83:
Code ST-3GENERALEQUIPMENTSPACE NAME
- Page 84 and 85:
Code WR-1GENERALSPACE NAMEStaff Wor
- Page 86 and 87:
code WT-1GENERALEQUIPMENTSPACE NAME
- Page 88 and 89:
1.X 4.1SYSTEM NARRATIVESThe followi
- Page 90 and 91:
CIVILExisting ConditionsThe existin
- Page 92 and 93:
m Drain Linemestic Water Lineanoutr
- Page 94 and 95:
Seismic Design:Wind Design:Occupanc
- Page 96 and 97:
Building Structural Framing SystemR
- Page 98 and 99:
Outside Design Conditions :Summer :
- Page 100 and 101:
feasible active systems will be exp
- Page 102 and 103:
RemarksThis is a good option if the
- Page 104 and 105:
Option 3: SPLIT SYSTEM HEAT PUMPSys
- Page 106 and 107:
Subjective CriteriaThis system has
- Page 108 and 109:
Subjective CriteriaThis system has
- Page 110 and 111:
Testing, Adjusting, Balancing And C
- Page 112 and 113:
Domestic Cold Water and Hot WaterA
- Page 114 and 115:
FIRE PROTECTION SYSTEMCodes and Sta
- Page 116 and 117:
Lighting fixtures of sizes, types,
- Page 118 and 119:
The central lighting control system
- Page 120 and 121:
LEED ® CreditsAn energy efficient,
- Page 122 and 123:
1.X 4.2CODEANALYSISSUPPORTSUMMARYDO
- Page 124 and 125:
1.X 4.3SUSTAINABLE DESIGNThe Univer
- Page 126 and 127:
leed ® checklistItem ItemPrerequis
- Page 128 and 129:
ItemItemPrerequisiteSUPPORTDOCUMENT
- Page 130 and 131:
ItemItemPrerequisiteUCR BaselineAdd
- Page 132 and 133:
1.X 4.4ThePhasingintent of the Univ
- Page 134 and 135:
LEGENDHousingCommunity SpaceCircula
- Page 136 and 137:
1.X 4.5TheScheduleproject schedule
- Page 138 and 139:
1.X 5.1Cost model summaryThe follow
- Page 140 and 141:
Glen Mor 2 Student HousingCost Mode
- Page 142 and 143:
Glen Mor 2 Student HousingCost Mode
- Page 144 and 145:
Glen Mor 2 Student HousingCost Mode
- Page 146 and 147:
1.X 6.1MeetingnotesAPPENDIX SUMMARY
- Page 148 and 149:
22 October 2008 | 322 October 2008
- Page 150 and 151:
28 October 2008 | 328 October 2008
- Page 152 and 153:
28 October 2008 | 728 October 2008
- Page 154 and 155:
28 October 2008 | 328 October 2008
- Page 156 and 157:
• o o o o o • o o o o o
- Page 158 and 159:
• • • • • • •
- Page 160 and 161:
• • • • • • • • •
- Page 162 and 163:
1.X 6.2AlternativestudiesAPPENDIX S
- Page 164 and 165:
Alternative BThis scheme studied th
- Page 166 and 167:
Alternative DThe sole intent of thi
- Page 168 and 169:
1.X 6.3De ta i l e d cost modelAPPE
- Page 170 and 171:
Glen Mor 2 Student HousingDetailed
- Page 172 and 173:
Glen Mor 2 Student HousingDetailed
- Page 174 and 175:
Glen Mor 2 Student HousingDetailed
- Page 176 and 177:
Glen Mor 2 Student Housing Universi
- Page 178 and 179:
Glen Mor 2 Student Housing Universi
- Page 180 and 181:
Glen Mor 2 Student Housing Universi
- Page 182 and 183:
Glen Mor 2 Student Housing Universi
- Page 184 and 185:
Glen Mor 2 Student Housing Universi
- Page 186 and 187:
Glen Mor 2 Student Housing Universi
- Page 188 and 189:
Glen Mor 2 Student Housing Universi
- Page 190 and 191:
1.X 6.4LISTOF AbbreviationsAPPENDIX
- Page 192:
PPRIpsfpsiPTHPPVPVCRRARDSsfSLRSSMAC