PROJECT SCHEDULE<strong>Glen</strong> <strong>Mor</strong> 2 is anticipated to start the Design Phase in the spring of <strong>2009</strong>, the Working Drawing Phase in thewinter of 2010, with Construction underway in the summer of 2010. Occupancy is slated for fall 2012. Thisschedule suggests a delivery method that accommodates fast-tracking or selective scope bid packaging toassure construction starts before documentation is fully complete.Activity # of 2008-<strong>2009</strong> July <strong>2009</strong>-2010 July 2010-2011 July 2011-2012 July 2012-2013Months J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M JJ A S O N D J F M A M J J A S O N D J F M A M JPreliminary Plans 10CEQA 6Working Drawings 12Agency Review 3Bid/Award Contract 9Construction 24Equipment/Occupancy 2Total CumulativeCalendar Months42SUMMARYUNIVERSITY OF CALIFORNIA, RIVERSIDE GLEN MOR 2 STUDENT HOUSING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!