12.07.2015 Views

2007 Annual Report - Institute for Environmental Monitoring and ...

2007 Annual Report - Institute for Environmental Monitoring and ...

2007 Annual Report - Institute for Environmental Monitoring and ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PANEL RECOMMENDATIONS GOVERNMENT DECISIONS INSTITUTE RESPONSE27. The panel recommended that acontinuing program of monitoring <strong>and</strong>study be carried out to ensure that noiseeffects do not remain undiscovered <strong>and</strong>unmitigated. Particular attention should bepaid to monitoring the impact of noise onthe school environment.Natural Environment Issues30. The panel recommended that astudy to determine the behavioural <strong>and</strong>population responses of Osprey <strong>and</strong>Bald Eagles to overflights be an effectsmonitoring priority.Neat St<strong>and</strong>Government accepted thisrecommendation <strong>and</strong> it wasreferred to the <strong>Institute</strong>.Government accepted thisrecommendation <strong>and</strong> it is to beimplemented as appropriate,following consultation withprovincial authorities, the<strong>Institute</strong>, stakeholders or otheragencies.Previous studies reviewed by the IEMR indicated thatthe current noise disturbance within Spruce Park <strong>and</strong>the surrounding areas comply with the acceptableCanadian guidelines. Robert Leckie School, which waslocated in Spruce Park, has been closed since 1998.Should supersonic training take place, the IEMRwill undertake a field monitoring program. Noisedisturbance around the aerodrome will be monitoredduring the evening segments of this training initiativeto ensure that noise levels do not cause unduedisturbances. Particular attention would be allocatedto noise disturbance within Spruce Park shouldtraining occur during the evenings.Should military transport aircraft (transall) trainingbecome an important component of the trainingactivities, the IEMR will assess the noise disturbanceassociated with it within the LLTA.The IEMR has finalized a working version of Boom-Cast. The predictive model is currently being betatested by the IEMR. Following the initial verification,IEMR will proceed with a field testing of the model.After a review of the results of four years ofmonitoring of Osprey populations conducted by DND,the IEMR agreed to continue a long-term monitoringprogram of Osprey population trends <strong>and</strong> reproductionsuccess within <strong>and</strong> outside the LLTA. This monitoringprogram identified any sudden changes within theOsprey population <strong>and</strong> also provided additional datathat could help to assess the residual impacts thatcould not be confirmed from the previous DNDstudies.In <strong>2007</strong>, the IEMR finalized the fifth year of itslong-term monitoring program of Osprey populationtrends <strong>and</strong> reproductive success both within <strong>and</strong>outside the LLTA. The results indicate that annualvariances do occur in the populations located within<strong>and</strong> outside the LLTA. However, the results to date donot indicate any significant long-lasting trends.The IEMR will proceed with the analysis of the Ospreydata collected. Following the analysis, IEMR willreconvene a technical workshop to assess the resultsof the analysis <strong>and</strong> determine if future field monitoringis required.2 0 0 7 A n n u a l R e p o r t I n s t i t u t e f o r E n v i r o n m e n t a l M o n i t o r i n g a n d R e s e a r c h P a g e 1 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!