(ii)Construction site should be inspected by concerned RE. Also quarry sites<strong>and</strong> availability of construction material at the quarries be ascertained <strong>and</strong>material <strong>and</strong> transportation cost be enquired <strong>and</strong> worked out.(iii)Whether completion period allowed is sufficient or not. Adequacy ofstage-wise completion targets with respect to time allowed for completionof each stage be checked.(iv)If a pre-bid conference has been arranged, all issues of doubt/ambiguitybe raised in it <strong>and</strong> clarification sought.(v)Availability of required construction machinery <strong>and</strong> equipment, tools <strong>and</strong>plant be ensured from within the Corporation or outside agencies <strong>and</strong>their cost worked out.(<strong>vi</strong>)It may be ensured that the l<strong>and</strong> pro<strong>vi</strong>ded for site of construction is freefrom all encumbrances <strong>and</strong> the l<strong>and</strong> has been properly acquired <strong>and</strong> itsphysical possession has been taken. Sometimes, the delay in acquisition ofrequired l<strong>and</strong> needed for construction causes undue delay in construction<strong>and</strong> increases cost which may not be fully compensated within pro<strong>vi</strong>sionsof the agreement.(<strong>vi</strong>i)Adequacy of price escalation formula in agreement be seen <strong>and</strong> actualtrend of increase/decrease in market prices of material <strong>and</strong> labour be keptin <strong>vi</strong>ew.(<strong>vi</strong>ii) The RE should himself confidentially work out with assistance of ARE theproposed tender rates (percentage or item rates, as the case may be)keeping all the factors in <strong>vi</strong>ew. For this, total quantity of each material78

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!