l^h-hIe-((m*vk-kcvt-=! cmi-qJki-hÄe-xk=!h


Section IX: <strong>Bill</strong> <strong>of</strong> <strong>Quantities</strong> Sokporongchu BridgePreamble to <strong>Bill</strong> <strong>of</strong> Quantity (BoQ)1. The <strong>Bill</strong> <strong>of</strong> Quantity as given shall be read in conjunction with: i) The TechnicalSpecification; and ii) The Drawings.2. Details <strong>of</strong> the item descriptions can be found in the related section <strong>of</strong> The TechnicalSpecification the references <strong>of</strong> which are shown in the left most column <strong>of</strong> the BoQ.3. Before entering rate for an individual item, the Contractor must go through the relatedpart(s) <strong>of</strong> The Technical Specification to understand the work and its scope, method <strong>of</strong>measurement and basis <strong>of</strong> payment for the respective item.4. <strong>Quantities</strong> given in the BoQ are computed net from the Drawings. Unless directedotherwise in the Contract, no allowance shall be made for bulking, shrinkage, or wastage.<strong>Quantities</strong> are rounded up or down where appropriate.5. The quantities given in the <strong>Bill</strong> <strong>of</strong> <strong>Quantities</strong> are estimated and provisional, and are givento provide a common basis for Tendering. The basis <strong>of</strong> payment shall be the actualquantities <strong>of</strong> work ordered and carried out, as measured by the Contractor and verified bythe Department/Consultant and valued at the rates or prices quoted in the priced BoQ,where applicable, and otherwise at such rates or prices as the Department/Consultant mayfix within the terms and conditions <strong>of</strong> the Contract.Gyelposhing – Nganglam Highway Page 1


Section IX: <strong>Bill</strong> <strong>of</strong> <strong>Quantities</strong>Sokporongchu BridgeSN Type <strong>of</strong> work Total Cost (Nu)1 General and Site Facilities"Summary <strong>of</strong> cost"2 Site Clearance and Earth Work3 Structures4 Miscellaneous WorksTotal CostGyelposhing-Nganglam Highway Page 2


Section iX: <strong>Bill</strong> <strong>of</strong> <strong>Quantities</strong>Sokporongchu BridgeImportant Note: Please refer to the relevant sections <strong>of</strong> the Technical Specification (TS) for detailed workdescriptions and methods <strong>of</strong> measurement and payment. The BoQ has to be read in conjunction with the TSand the drawings and not in isolation.Section 1: General and Site facilitiesItemcodeTS ref.no.1001 1/1/1Description <strong>of</strong> item Unit QuantitySite Installation (facilities, tools,plant, equipment, insurance and s<strong>of</strong>orth)LS 1.00Rate(Nu)Total for Section 1:Amount(Nu)Gyelposhing-Nganglam Highway Page - 3


Section IX: <strong>Bill</strong> <strong>of</strong> <strong>Quantities</strong>Sokporongchu BridgeSection 2: Site Clearance and Earth WorkItemCodeTS ref.no.2001 2/1/1Description <strong>of</strong> item Unit QuantityClearing jungle including uprooting <strong>of</strong>rank vegetation, grass, brushwood,saplings and trees <strong>of</strong> girth upto 300mmmeasured at height <strong>of</strong> 1m above groundlevel and disposal <strong>of</strong> rubbish within50m leadm 2 2,500.00Rate(Nu)Amount(Nu)2002 2/1/22003 2/2/1Felling trees <strong>of</strong> girth 300mm and above(girth measured at a height <strong>of</strong> 1m aboveground level) including cutting <strong>of</strong> trunksand branches, removal <strong>of</strong> roots andstacking <strong>of</strong> serviceable materials anddisposal or rubbish within 50m lead.Excavation for foundations A1 and A2true to the lines and levels shown in therelevant drawings. The excavation shallbe measured and paid for as solidvolume (refer TS):nos. 3.002003.1 2/2/1.1 a) All kinds <strong>of</strong> soil m 3 18.542003 2/2/1.2 b) All kinds <strong>of</strong> rocks m 3 208.202004 2/2/2Exacvation <strong>of</strong> arch footings F1, F2, F3and F4 true to the lines and levelsshown in the relevant drawings. Theexcavation shall be measured and paidfor as solid volume. For the archfootings, the height <strong>of</strong> the excavationshall be measured along the inclination<strong>of</strong> the arch pr<strong>of</strong>ile and not vertical. Theexcavation may be above or under waterdepending on the foundation depth andthe working season and therefore thesame shall be accounted for whilesetting the rates. No additionalpayments shall be made for pumping2004 2/2/2.1 a) All kinds <strong>of</strong> soil m 3 343.222004 2/2/2.2 b) All kinds <strong>of</strong> rocks m 3 800.85Gyelposhing-Nganglam Highway Page - 4


Section IX: <strong>Bill</strong> <strong>of</strong> <strong>Quantities</strong>Sokporongchu BridgeItemCodeTS ref.no.2005 2/2/3Description <strong>of</strong> item Unit QuantityExcavation for widening <strong>of</strong> theapproach road on the left bank(Nganglam Side). The excavation shallbe measured and paid for as actualvolume <strong>of</strong> in-situ excavation as perrelevant drawings or as directed by theEngineer and not as solid volume.2/2/3.1 All kinds <strong>of</strong> soil m 3 700.002/2/3.2 All kinds <strong>of</strong> rocks m 3 550.00Rate(Nu)Amount(Nu)2006 2/2/4Backfilling <strong>of</strong> the foundationpits/trenches around the permanentstructures to the lines and levels as perthe finished pr<strong>of</strong>iles shown in thedrawings. The quantity also includes thecompacted fillings behind the abutmentsand the return walls. The filling shall becompacted in layers not exceeding 200mand each layer shall be compacted byramming, rolling etc. The fill materialshall be approved by the engineer. Thequantity covers backfilling/filling for allsix foundations <strong>of</strong> the bridge (A1, A2,F1, F2, F3 & F4)m 3 771.81Total fo Section 2:Gyelposhing-Nganglam Highway Page - 5


Section IX: <strong>Bill</strong> <strong>of</strong> <strong>Quantities</strong>Sokporongchu BridgeSection 3: StructuresItemCodeTS ref.no.Concrete Works;3001 3/1/1Providing and laying leveling concrete inPlain Cement Concrete (PCC) for all thefoundations <strong>of</strong> the bridge. Concrete gradeis M15. Additional PCC required to levelinaccurate or over excavation shall not bem 3 25.03paid extra. The sides <strong>of</strong> the concrete canbe inclined and therefore formwork is notnecessary.Providing and laying Reinforced CementConcrete (RCC) <strong>of</strong> grade M35 for3002 3/1/2 abutments A1 and A2 to the lines, levels,form, shape and dimensions as detailed inthe relevant drawings:3002.1 3/1/2.1 a) Footing slabs <strong>of</strong> the abutments m 3 37.103002.2 3/1/2.23003 3/1/3Description <strong>of</strong> item Unit Quantityb) Abutment walls (stem), dirt walls &return walls including supply, placing andbuilding in <strong>of</strong> the weep pipes as per detailsshown in the relevant drawingsProviding and laying RCC <strong>of</strong> grade M35for the two arches to the lines, levels,form, shape and dimensions as detailed inthe relevant drawingsm 3 15.383003.1 3/1/3.1 a) Footing slabs <strong>of</strong> the two arch ribs m 3 188.163003.2 3/1/3.2 b) Arch ribs and arch cross beams m 3 606.06Rate(Nu)Amount(Nu)3004 3/1/43005 3/1/5Providing and laying RCC <strong>of</strong> grade M35for the columns to the lines, levels, form,shape and dimensions as detailed in therelevant drawingsProviding and laying RCC <strong>of</strong> grade M35for the deck system - slab, beams, crossbeams & kerbs to the lines, levels, form,shape and dimensions as detailed in therelevant drawingsm 3 76.95m 3 567.78Gyelposhing-Nganglam Highway Page - 6


Section IX: <strong>Bill</strong> <strong>of</strong> <strong>Quantities</strong>Sokporongchu BridgeItemCodeTS ref.no.3006 3/1/6Formwork;Description <strong>of</strong> item Unit QuantityProviding and laying RCC <strong>of</strong> grade M35for the approach slabs to the lines, levels,form, shape and dimensions as detailed inthe relevant drawings3007 3/2/1Centering and shuttering for abutments A1and A2 including all scaffolds, props etc.required to support the shuttering:3007.1The sides <strong>of</strong> the footing slabs <strong>of</strong> the3/2/1.1abutments3007.2Abutment walls (stem), dirt walls, return3/2/1.2walls etc.Centering and shuttering for two archesincluding all scaffolds, props etc. requiredto support the shuttering. The height fromthe ground/river bed to the centre <strong>of</strong> thearch rib at the crown is more than 20metres. The contractor should be aware <strong>of</strong>3008 3/2/2the fact that it will take a good planning byan experiencedengineerto design and erectthe temporary support and scaffold systemfor the construction <strong>of</strong> the bridge. The rateshall be inclusive <strong>of</strong> planning, design,material, labor, equipment, erection and allother efforts required to fulfill the task infull:Foundation footing slabs <strong>of</strong> the arches. Thequantity includes formwork for two sides,3008.1top and the front. The arch footings are3/2/2.1inclined and therefore footing base and thebottom side are supported on the levelingconcrete which will be paid separately.3008.2Arch ribs (all four sides) and the arch cross3/2/2.2beams (bottom and the two sides).Centering and shuttering for the Columns3009 3/2/3 including all scaffolds and props <strong>of</strong> allheightsCentering and shuttering for the deck3010 3/2/4 system including all scaffolds and props <strong>of</strong>all heights:3010.1Deck slab, longitudinalbeams and the deck3/2/4.1cross beamsm 3 11.47m 2 36.68m 2 75.14m 2 201.86m 2 1,479.32m 2 320.59m 2 1,543.34Rate(Nu)Amount(Nu)Gyelposhing-Nganglam Highway Page - 7


Section IX: <strong>Bill</strong> <strong>of</strong> <strong>Quantities</strong>Sokporongchu BridgeItemCodeTS ref.no.Description <strong>of</strong> item Unit Quantity3010.2 3/2/4.2 Sides <strong>of</strong> the kerbs & dividers m 2 275.943011 3/2/5Reinforcement;3012 3/3/13013 3/3/23014 3/3/33015 3/3/43016 3/3/5Centering and shuttering for the sides <strong>of</strong>the Approach slabsProviding and laying High Yield StrengthDeformed (HYSD) bars conforming tograde Fe500 as per IS:1786 for abutmentsA1 and A2Providing and laying HYSD barsconformingto grade Fe500 as per IS:1786for arch footings, arch ribs and archcross beams.Providing and laying HYSD barsconformingto grade Fe500 as per IS:1786for columnsProviding and laying HYSD barsconformingto grade Fe500 as per IS:1786for deck slab, longitudinal beams, kerbsand deck cross beams.Providing and laying HYSD barsconformingto grade Fe500 as per IS:1786for approach slabs.m 2 11.60ton 3.61ton 114.47ton 31.69ton 112.65ton 1.37Rate(Nu)Total fo Section 3:Amount(Nu)Gyelposhing-Nganglam Highway Page - 8


Section IX: <strong>Bill</strong> <strong>of</strong> <strong>Quantities</strong>Sokporongchu BridgeSection 4: Miscellaneous WorksItemCodeTS ref.no.4001 4/1/14002 4/2/14003 4/2/24004 4/3/14005 4/4/14006 4/5/1Description <strong>of</strong> item Unit QuantityProviding and laying Asphalt/BituminousConcrete Wearing Course <strong>of</strong> thickness =60mm on the bridge deck and the approachslabs to the required degree <strong>of</strong> compactionbased on the job mixture formula approvedby the Engineer using asphalt plant, paver,steel roller, tyre roller etc. as per thematerial gradation and aggregate qualityspecified including application <strong>of</strong> primecoat @ 0.75kg/m 2. The thickness <strong>of</strong> thewearingProviding and laying Drainage Spouts asper the details shown in the designdrawings. The drainage spouts have to beembedded in the deck slab concrete to thecorrect line and level shown in the relevantdrawings.Providing and fixing HDPE drainagepipes in the deck slab underneath the footpath slabs as per the details shown in therelevant drawings. The pipes have to beembedded in the deck slab concrete to thecorrect line and level shown in the relevantdrawings.Providing and laying to the correct line andlevel, as per the relevant drawings, steelreinforced elastomeric bearings <strong>of</strong> thesize, thickness and shape shown in therelevant drawingsProviding and laying Strip Seal typeExpansion Joints as per the details shownin the relevant drawingsProviding and laying gabion wire meshwall as per the details shown in therelevant drawings including excavationand backfilling. The rate shall be inclusive<strong>of</strong> all material, labor, equipment and allother efforts required to fulfill the task infull in accordance with the Drawings andthe Technical Specificationm 2 874.78pcs. 44.00m 22.00pcs. 4.00m 21.20m 3 1,360.00Rate(Nu)Amount(Nu)Gyelposhing-Nganglam Highway Page - 9


Section IX: <strong>Bill</strong> <strong>of</strong> <strong>Quantities</strong>Sokporongchu BridgeItemCodeTS ref.no.4007 4/6/14008 4/7/14009 4/8/1Description <strong>of</strong> item Unit QuantityConstruction <strong>of</strong> L-shaped drain as perdrawings with 150mm thick plain cementconcrete grade M10, RRM in CM 1:5 onsides finished with 20mm thick plaster inCM 1:4 including excavation, leveling anddisposal <strong>of</strong> surplus earth within 50m lead.Manufacture and placing <strong>of</strong> the reinforcedconcrete precast footpath slabs true to thelines and levels shown in the designdrawings. The concrete shall conform toGrade M35 as per IS:456 and thereinforcement shall be Grade Fe500 as perIS:1786. The rate shall be inclusive <strong>of</strong>material, labor, equipment and all otherefforts required to fulfill the task.Providing and laying reinforced concreterailings true to the lines and levels shownin the design drawings. The concrete shallconform to Grade M35 as per IS:456 andthe reinforcement shall be Grade Fe500 asper IS:1786. The rate shall be inclusive <strong>of</strong>material, labor, equipment and all otherefforts required to fulfill the task.m 100.00no. 474.00m 236.00Rate(Nu)Total fo Section 4:Amount(Nu)Gyelposhing-Nganglam Highway Page - 10


Section IX: <strong>Bill</strong> <strong>of</strong> <strong>Quantities</strong>Sokporongchu BridgeSection 5: DAYWORKSItemCodeTS Ref.No.Description <strong>of</strong> itemUnitRate (in Nu.)5.2Schedule <strong>of</strong> Daywork Rates: LABOR5001 Gangerhr5002 Unskilled laborerhr5003 Masonhr5004 Electricianhr5005 Carpenterhr5006 Bar bender and fitterhr5007 Painterhr5008 Welderhr5009 Gas cutter operatorhr5010 Driver for light vehiclehr5011 Driver for heavy vehiclehr5012Operator for excavator or pay loader hr5013 Operator for compressor.hr5014Operator for dozer.hr5015Crane operatorhr5016 Operator for water pump.hr5.3Schedule <strong>of</strong> Daywork Rates : MATERIALS5017per 50 kgbagper 50 kgCement (PPC & PSC)5018bag5019 Reinforcement, HYSD Fe500Tonne5020 Aggregate 20mm & downCu. Meter5021 Aggregate 10mm and downCu. Meter5022 Sand (rievr/crushed)Cu. Meter502350245025Cement (OPC min. grade 43)Timber, wood for scaffolding, struttsand so forth.Water pro<strong>of</strong> ply board fit for shuttering& formworkBlasting material (Gelatine 60 %, orequivalent) including caps. fuse wireand requisite accesories.Sq. MeterSq. MeterkgGyalposhing - Nganglam Highway Page 11


Section IX: <strong>Bill</strong> <strong>of</strong> <strong>Quantities</strong>Sokporongchu Bridge5.4 Secedule <strong>of</strong> Daywork Rates: CONSTRUCTION PLANTS5026 Excavator upto and including 1m3 hrExcavator over 1m3 upto and including50272m3hr5028 Excavator over 2m3hrCompressor suitable for all kinds <strong>of</strong>5029work including all accessorieshrGenerator <strong>of</strong> suitable capacity with three5030phase linehrCrane min. 5ton capacity at full boom5031length <strong>of</strong> min. 25mhr5032 Concrete Mixer 7/5 cftConcrete Mixer 10/7 cfthrhrConcrete Vibrator with nozzles <strong>of</strong>suitable capacity capable <strong>of</strong> operating hr5033upto and including 60mm dia. nozzlesBar cutter with blades and otherhr5034accessories5035 Tripper/dumperhr50365037503850395040Water pump upto and including 5HPincluding all fittings, suction anddelivery pipes and all other accessoriesWater pump over 5HP upto andincluding 10HP including all fittings,suction and delivery pipes and all otheraccessoriesWater pump above 10HP upto andincluding 20HP including all fittings,suction and delivery pipes and all otheraccessoriesWelding equipment including weldingrods and other consumablesGas cutter set with LPG, oxygen andother consumableshrhrhrhrhrGyalposhing - Nganglam Highway Page 12