12.07.2015 Views

BI Comb SGM.GB

BI Comb SGM.GB

BI Comb SGM.GB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.6 REMOVAL OF THE DISCHARGED ASHThe ash removal screw discharges from the front side of theboiler, to the left or right as desired, at a certain height fromthe floor. For correct automatic operation of the unit as awhole, a pick-up for conveying the ash to a collection bin isrequired. This pick-up system can be made up of a screw orother conveying device able to handle temperatures of atleast 400°C. The following are diagrams of typical solutions.The choice of system will obviously depend on the spaceavailable in the heating plant, with the pit solution preferredwhere possible, to allow free access to the various doors andhatches of the boiler bed and the boiler.4.6.1 ASH REMOVAL TO <strong>BI</strong>NBOILER BODYBOILER BEDFig. 114.6.2 DIRECT ASH REMOVAL, TO UNDERGROUND <strong>BI</strong>NVIEW FROM WREMOVABLE GRATEFig. 1216

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!