<strong>2009</strong> <strong>Annual</strong> <strong>Environmental</strong> <strong>Report</strong><strong>Southern</strong> <strong>Cross</strong> <strong>Operations</strong>• Haulage and spreading of topsoils on eastern and southern batter of GVG TSF2and TSF3;• Completion of capping previously uncapped sections of the surface of TSF3;and• Encapsulation of reactive waste materials situated at the northern toe of thewaste dump.Figure 6-1: Overview of Rehabilitation at GVG TSF 1-327