13.07.2015 Views

Southern Cross Operations Annual Environmental Report 2008 - 2009

Southern Cross Operations Annual Environmental Report 2008 - 2009

Southern Cross Operations Annual Environmental Report 2008 - 2009

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>2009</strong> <strong>Annual</strong> <strong>Environmental</strong> <strong>Report</strong><strong>Southern</strong> <strong>Cross</strong> <strong>Operations</strong>Groundwater LevelsPiezometric levels are discussed in section 5.1. Groundwater levels of boressurrounding the Marvel Loch TSF have been relatively static over the past year. BoresMB94E1 and MB94G1 have shown a slight increasing trend with readings of 0.34mand 0.4m respectively. MB94D1 has shown a slight decreasing trend with a reading of0.28m and MB94F1 remained constant. As shown in the graph, a value of 5.61m wasrecorded for MB94D1 on 20 December <strong>2008</strong>, it is believed that this value wasincorrectly recorded and should have been 4.61m, as shown by the “correction” line onthe graph. This correction is supported by the slight decreasing trend of the bore andconfirmation with the operator that the “5” instead of a “4” is a likely error.Figure 7-4: Groundwater Levels of Bores at the Marvel Loch TSFGroundwater Abstraction LicencesDuring the year groundwater abstraction occurred at SXO under the terms of the threeLicense to Take Water licences, Marvel Loch <strong>Operations</strong> 59227(3) (Lake Baladjie toYilgarn Star), <strong>Southern</strong> Star/Toomey Hills (104620(4)) and Blue Haze/Kondinin-Ravensthorpe (153325(3)). At the time of compiling the AER, the annual groundwaterreview was being prepared and will be submitted to the Department of Water oncecomplete.46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!