13.07.2015 Views

Southern Cross Operations Annual Environmental Report 2008 - 2009

Southern Cross Operations Annual Environmental Report 2008 - 2009

Southern Cross Operations Annual Environmental Report 2008 - 2009

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>2009</strong> <strong>Annual</strong> <strong>Environmental</strong> <strong>Report</strong><strong>Southern</strong> <strong>Cross</strong> <strong>Operations</strong>Specifically this related to the following:• W4(a) - Some poor maintenance of hydrocarbon collection facilities wasnoted during the year.No data was collected during the year to ascertain compliance against condition W11as the one bore in attachment 1 (EP Act Licence 4597/12) was dry for the entire year(please refer to section 7.3).8.3 Department of WaterAs previously reported, SXO amalgamated its eleven groundwater abstraction licencesinto three, and is required to submit an annual Groundwater Licence Review to theDepartment of Water (DoW). This requirement is detailed in the Operating Strategy forGroundwater Well Licence 59227 and 153325. A request to postpone the annualgroundwater licence review for 2007/<strong>2008</strong> til September <strong>2009</strong> was accepted by DoWand a bi-annual groundwater report has since been submitted in accordance with theoperating strategy.8.4 Department of Mines and PetroleumSite VisitMs Rosemarie De Bari and Mr Owen Wilson conducted an inspection of <strong>Southern</strong><strong>Cross</strong> <strong>Operations</strong> 24 November <strong>2008</strong> to verify information contained in the 2007/08<strong>Annual</strong> <strong>Environmental</strong> <strong>Report</strong>.Rosemarie De Bari also conducted a visit on 18 June <strong>2009</strong> for a review ofenvironmental performance bonds at SXO.8.5 Technical <strong>Report</strong>sDuring the year, the following technical reports were prepared to assist decisionmaking or environmental management activities at SXO:• <strong>Annual</strong> Tailings Storage Audit and Management Review – External auditconducted by Coffey Mining;• Construction <strong>Report</strong> – Raising of TSF2 Cell 1 by 2.5m to RL1037.5m;• Axehandle Achilles Vegetation Survey – flora survey prior to explorationactivities in the Cornishman belt;62

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!