13.07.2015 Views

Southern Cross Operations Annual Environmental Report 2008 - 2009

Southern Cross Operations Annual Environmental Report 2008 - 2009

Southern Cross Operations Annual Environmental Report 2008 - 2009

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>2009</strong> <strong>Annual</strong> <strong>Environmental</strong> <strong>Report</strong><strong>Southern</strong> <strong>Cross</strong> <strong>Operations</strong>Figure 6-6: Profiled and Topsoil Sheeted Batters of Norton Waste Dump6.4 KurrajongMining resumed at Kurrajong in February <strong>2009</strong> and was completed in April of the sameyear. The project comprised an open pit, three hectare waste dump, 1.5 kilometre haulroad and ROM facilities. The waste rock landform was progressively rehabilitated andbattered down to an 18° slope as per the Kurrajong Mining proposal. Salvagedtopsoils were eventually spread over the entire landform and deep ripped alongcontours (Figure 6-7). Seeding with local provenance native seed was completed inJune <strong>2009</strong>. The haul road to the Kurrajong ROM was also ripped, sheeted with topsoiland seeded during the reporting period (Figure 6-8). The removal of ore stockpiled onthe Kurrajong ROM in May was followed by deep ripping and seeding of the oxidesubstrate, which was completed in June. Rehabilitation of disturbance associated withthe Kurrajong mining project viz waste dump (3.0ha), haul road (2.63 ha) and ROM(6.79ha) totalled 12.42 hectares.31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!