7.4.4 ( C ) For those bidders, who have no in-house core-cutting facility, they should mention thenames of at least three sub-vendors to whom they intend to assign their core-cutting.Such sub-vendors should have been approved by other Electricity Board / ElectricalUtilities and accredited by some internationally recognized certification body like ISO-9000 etc. to ensure that a minimum quality parameters & tolerance are maintained. Theexperience, the details of core-cutting facilities finishing & testing facilities etc. asavailable which such sub-vendors should be clearly out-lined in the bid7.4.4 (D) On award of Contract the TM is to assign the core-cutting to such sub-vendors <strong>for</strong>which approval is to be given by the Purchaser.7.4.5 The laminations shall be free of all burrs and sharp projections. Each sheet shall have aninsulting coating resistant to the action of hot oil.7.4.6 The insulation structure <strong>for</strong> the core to bolts and core to clamp plates, shall be such as towithstand 2000 V DC voltage <strong>for</strong> one minute.7.4.7 The <strong>com</strong>pleted core and coil shall be so assembled that the axis and the plane of the outersurface of the core assemble shall not deviate from the vertical plane by more than 25mm.7.4.8 All steel sections used <strong>for</strong> supporting the core shall be thoroughly shot or sand blasted, aftercutting, drilling and welding.7.4.9 The finally assembled core with all the clamping structures shall be free from de<strong>for</strong>mati<strong>onan</strong>d shall not vibrate during operation.7.4.10 The core clamping structure shall be designed to minimize eddy current loss.7.4.11 The framework and clamping arrangements shall be securely earthed.7.4.12 The core shall be carefully assembled and rigidly clamped to ensure adequate mechanicalstrength.7.4.13 Oil ducts shall be provided, where necessary, to ensure adequate cooling inside the core. Thewelding structure and major insulation shall not obstruct the free flow of oil through suchducts.7.4.14 The design of magnetic circuit shall be such as to avoid static discharges, development ofshort circuit paths within itself or to the earth clamping structure and production of flux<strong>com</strong>ponent at right angle to the plane of the lamination, which may cause local heating. Thesupporting framework of the cores shall be so designed as to avoid the presence of pockets,which would prevent <strong>com</strong>plete emptying of the tank through the drain valve or cause trappingof air during filling.7.4.15 The construction is to be of boltless core type. The core shall be provided with lugs suitable<strong>for</strong> lifting the <strong>com</strong>plete core and coil assembly. The core and coil assemble shall be so fixedin the tank that shifting will not occur during transport or short circuits.7.4.16 The temperature gradient between core & surrounding oil shall be maintained less than20 deg. Centigrade. The manufacturer shall demonstrate this either through test (procurement to be mutually agreed) or by calculation.7.5 INTERNAL EARTHING7.5.1 All internal metal parts of the trans<strong>for</strong>mer, with the exception of individual laminations andtheir individual clamping plates shall be earthed.7.5.2 The top clamping structure shall be connected to the tank by a copper strap. The bottomclamping structure shall be earthed by one or more the following methods:a) By connection through vertical tie-rods to the top structure.45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!