13.07.2015 Views

Preliminary Final Report - Financial Review

Preliminary Final Report - Financial Review

Preliminary Final Report - Financial Review

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• US$512m (US$333m) for engineering, procurementand construction of a 2 lane road tunnel, Jammu,Northern India, for IL&FS Transportation Networks Ltd.• US$346m for mining operations at the Masbate goldmine, Philippines, for the Philippines Gold Processing& Refining Corporation.• US$442m (US$333m) for construction of Rail tunnelsand associated ventilation and access structuresbetween Tse Uk Tseun in Kam Tin and Shek Yam inKwai Chung, Hong Kong, for MTR CorporationLimited.• US$324m to construct 1.8km of elevated viaduct andtwo elevated stations with footbridge connections,Hong Kong, for MTR Corporation Limited.• US$300m contract to develop and operate theKhushuut coal mine in western Mongolia for MongoliaEnergy Corporation.• US$279m (US$223m) for the construction of Stage 2Aof the Harbour Area Treatment Scheme (HATS), HongKong, for Hong Kong Drainage Service Department.• US$176m to install approximately 360km of doubletrack from Ipoh to Padang Besar, for the MMCGamuda Joint Venture Sdn Bhd.• US$163m to construct a cut and cover tunnel for theHighways Department of the Hong Kong Government.• US$160m to construct drainage tunnels at the Lai ChiKok Transfer Scheme, Hong Kong, for the Hong KongDrainage Service Department.• US$154m for mining operations at Martabe gold mine,Indonesia, for PT Agincourt Resources.• US$284m (US$142m) JV to construct a cut and coverapproach tunnel for West Kowloon Terminus, HongKong, for MTR Corporation Ltd.• US$561m (US$135m) JV to design and constructsludge treatment facilities at Tuen Mun, for VW-VES(HK) Ltd.• US$131m for mining operations at the Toka Tindunggold mine, Indonesia, for PT Meares SoputanMining/Achipelago Resources Pty.• US$237m (US$130m) JV to construct railway tunnelsbetween the Aberdeen Channel Bridge and theproposed South Horizons Station, for MTRCorporation Limited.• US$110m (US$72m) to design and construct the WINRevamp Project, India, for Oil & Natural GasCorporation Ltd.• US$205m (US$105m) to design and construct aneight-storey, 160 bed hospital block, Hong Kong, forthe Architectural Services Department of the HongKong Government.• US$98m to prepare site and bulk earthworks inpreparation for gold mining and a processing plant atMartabe, North Sumatra, for PT Agincourt Resources.• US$96m for the construction of a Grade A OfficeTower with 34 office floors and 5 basement parkingfloors in the Philippines, for Bridgebury RealtyCorporation-Zuellig Group.• US$82m for the demolition, disposal anddecommissioning of concrete storage bunkers, for theMMC Gamuda Joint Venture Sdn Bhd.• US$78m (US$51m) to construct the Ramanujan ITPark, Chennai, India, for Tata Realty andInfrastructure.• US$72m for engineering, procurement, projectmanagement, and installation of a single point mooringsystem, for Tanzania Ports Authority.• US$130m (US$65m) to construct the Sungei RoadRail Station together with twin tunnels of approximately770m, for the Land Transport Authority of Singapore.• US$50m for project management services for theUkhaa Khudag to Gashuun Sukhait freight railway inthe South Gobi region of Mongolia, for EnergyResources Rail LLC.• US$46m to modifiy works to the Black Point powerstation in preparation for a new gas supply due in2013, for the China Light & Power Limited, HongKong.• US$40m for site preparation work, for the JGCCorporation, Hong Kong.Leighton Middle East & Africa• US$290m (US$131m) for the construction of NorthGate Mall, Qatar, for Northgate Group.• US$306m (US$69m) for the construction of nineinterchanges and 50 kilometres of service roads,Oman, for the Government of the Sultanate of Oman.• US$2.41bn (US$1.08bn) for the construction of theDubai Pearl, Dubai, UAE, for Pearl Dubai FZ LLC.• US587m (US$352m) to deliver mining services atJwaneng, Botswana, for Debswana.• US$498m (US$224m) for the construction of the AlBustan mixed use development, Abu Dhabi, UAE, forthe Al Hamid Group.• US$430m (US$193m) for the construction of the RitzCarlton Hotel, Abu Dhabi, UAE, for Abu Dhabi NationalHotels.• US$347m (US$156m) for the construction of the AlGhurair City Expansion, Dubai, UAE, for Al GhurairCentre LLC.• US$338m (US$152m) for the construction of the P9Mixed Use Development, Abu Dhabi, UAE, for East &West International Group.• US$324m (US$146m) for the construction of roadsand services for the KPIZ Industrial, Abu Dhabi, UAE,for the Abu Dhabi Ports Company (ADPC).• US$316m (US$142m) for the construction of the KPIZPort Infrastructure-Onshore Civil & Building, AbuDhabi, UAE, for the Abu Dhabi Ports Company(ADPC).• US$591m (US$128m) for the construction of Al MafraqHospital, Abu Dhabi, UAE, for the Abu Dhabi HealthServices Company.• US$443m (US$120m) for the construction of the DubaiTower, Qatar, for Dubai International Properties.• US$441m (US$99m) for the construction of the 72storey Landmark Tower, Abu Dhabi, UAE, for theDepartment of Presidential Affairs.• US$214m (US$96m) for the construction of a hotel,office and residential Towers at DIFC, Dubai, UAE, forDaman Real Estate Capital Partners.• US$206m (US$93m) for the construction of the Duhailand Umm Qarn water reservoirs, Qatar, for QatarGeneral Electricity & Water Corporation.• US$140m (US$63m) for the construction a four levelbasement structure, Dubai, UAE, for DubaiInternational Real Estate.• US$139m (US$63m) for the construction of anadministration and accomodation complex, Abu Dhabi,UAE, for the Abu Dhabi Company for Onshore OilOperations (ADCO).• US$118m (US$53m) to construct the Arzanah MedicalCentre, Abu Dhabi, UAE, for Medical HoldingCompany LLC – Mubadala.• US$110m (US$50m) for the construction of new bankheadquarters, Abu Dhabi, UAE, for Abu Dhabi IslamicBank.•Leighton Holdings Limited DECEMBER 2011 UPDATE Page 51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!