13.07.2015 Views

Town Center Subbasin Study Report - Bellingham Massachusetts

Town Center Subbasin Study Report - Bellingham Massachusetts

Town Center Subbasin Study Report - Bellingham Massachusetts

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Proposed Designs for Drainage Area O24: Municipal <strong>Center</strong>O24 Municipal <strong>Center</strong>: Infiltration TrenchStormwater Control Description:An infiltration trench will be constructed to capture,treat, and infiltrate runoff from the driveway andparking lot behind the Municipal center building.Currently, this runoff is all collected by a single catchbasin in the rear lot which will remain and act as abypass of the infiltration trench for larger storm events.Infiltration TrenchO24 Municipal <strong>Center</strong>: Infiltration TrenchAA’Drainage Area (acres) 0.68Impervious Area (acres) 0.68Estimated Infiltration Rate (in./hr) 4.46Target Phosphorus Removal 79.5%Water Quality Depth (in.) 0.48Water Quality Volume (ft3) 1,130±Stormwater control Surface Area (ft2) 820±Estimated Construction Cost $7,840Plan and section details can be found in Appendix C.22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!