Town Center Subbasin Study Report - Bellingham Massachusetts
Town Center Subbasin Study Report - Bellingham Massachusetts
Town Center Subbasin Study Report - Bellingham Massachusetts
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Proposed Designs for Drainage Area O18-B: TOWN COMMONSBEFORE: Photo of north edge of <strong>Town</strong> CommonsAFTER: Visualization of proposed bioretention basinO18-B <strong>Town</strong> Park on North Main Street: Rain GardenStormwater Control Description:A rain garden will provide treatment for the existingpark and associated parking lot and walking trails.Runoff generated by the development locatedsoutheast of the park will also be captured and treatedin the bioretention basin. An overflow structure isprovided in the rain garden to re-route large stormevents around the unit.O18-B North Main Street: Rain GardenDrainage Area (acres) 6.52Impervious Area (acres) 2.34Estimated Infiltration Rate (in./hr) 0.73Target Phosphorus Removal 58.1%Water Quality Depth (in.) 0.23Water Quality Volume (ft3) 2,000±Stormwater Control Surface Area (ft2) 3,840±Estimated Construction Cost $25,400Plan and section details can be found in Appendix C.29