13.07.2015 Views

draft revised kaihu river management plan - Northland Regional ...

draft revised kaihu river management plan - Northland Regional ...

draft revised kaihu river management plan - Northland Regional ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Northland</strong> <strong>Regional</strong> Councilpotentially compromised by sediment accumulation due to trapping ofsediment in ricegrass on the banks. Removal of bed sediments is notpractical, given constraints of the reach of available machinery andcost implications.In Section 1, machine cleaning will be done on both banks annuallyexcept for a section on the left bank where the floodwall exists and asection on the right bank where a slump compromises machineaccess. In Section 2, machine cleaning will be done annually on bothbanks. In Section 3, machine cleaning will be done on one side of the<strong>river</strong> annually, commencing with the left bank in Year 1, and alternatingbetween right and left banks on subsequent years.3.3. Clean Inside BendsFrom Rotu Bottle Neck to Waihue Road the channel meanders andthe <strong>river</strong> gradient is low. Excavation of accumulated sediments fromthe inside bends is proposed for this section. This <strong>river</strong> work requiresan annual assessment prior to commencement to prioritise removal forthose bends that would contribute greatest to stream bank erosionand/or loss of assets.3.4. Spray WillowsWillows in the channel which reduce the capacity of the flow and/orresult in potential for debris blockages or streambank erosion requiremaintenance. The maintenance <strong>plan</strong> provides for three years ofspraying in the three upstream sections of Kaihu River.3.5. Remove Fallen Debris That Dam The RiverThe significant debris that dam the <strong>river</strong> specifically in the section fromWaihue Road to Ahikiwi are the fallen mature poplar trees, shootscoming from the exposed roots of the poplar trees along the channeland willows. This <strong>river</strong> maintenance is done annually on the two uppersections of the channel, with an annual assessment undertaken at thecommencement of the works season to identify blockages andprioritise removal.3.6. Gravel ManagementLarger gravel is accumulated upstream of Ahikiwi, reducing in sizedownstream.Where the accumulation of gravel in the channel causes flowobstruction or flow diversion that introduces streambank erosionwhich in turn risk damage to assets, gravel <strong>management</strong> may berequired.Any person who wants to extract gravels from the channel ispermitted as long as the activity falls within the scope of the permittedKaihu River Maintenance Plan 2010-2016 - 5 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!