13.07.2015 Views

draft revised kaihu river management plan - Northland Regional ...

draft revised kaihu river management plan - Northland Regional ...

draft revised kaihu river management plan - Northland Regional ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Northland</strong> <strong>Regional</strong> Councilactivity rules set by the <strong>Regional</strong> Water and Soil Plan for <strong>Northland</strong> 2 .Activities which fall outside the rules such as extracting quantities ofgravel greater than 100 cubic meters in 12 months among othersneed to seek consents from the <strong>Northland</strong> <strong>Regional</strong> Council or rely onexisting consents for gravel extraction such as that held by the<strong>Northland</strong> <strong>Regional</strong> Council.3.7. River Cross Section SurveyEvery five years, a <strong>river</strong> channel cross section survey will beconducted on fifteen locations in the <strong>river</strong> from SH Bridge to RotuBottleneck. This will provide a basis for assessing the effectiveness ofthe maintenance programme and assessing changes in <strong>river</strong> capacityover time. The proposed cross section locations are shown in Figure6.4. Proposed Annual Work Programme and Indicative CostingsThe proposed annual work programme and cost estimates provideinformation on the forecast Kaihu River Maintenance Work. It isessential that there is an annual pre-works assessment of the <strong>river</strong> toconfirm priorities for <strong>river</strong> works that are required. Figures 2-6 andTable 2 show the summary annual programme for each of the <strong>river</strong>sections.2Rule 31.01.01, <strong>Regional</strong> Water and Soil Plan for <strong>Northland</strong>, Page 31-1Kaihu River Maintenance Plan 2010-2016 - 6 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!