13.07.2015 Views

Prisma Plus G - Schneider Electric

Prisma Plus G - Schneider Electric

Prisma Plus G - Schneider Electric

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Original Manufacturer and Assembly Manufacturer:Both involvedin tested assembliesStandard IEC 61439 clearly definesthe type of verifications that must be conductedby both organisations involved in final conformity ofthe solution: the Original Manufacturer, guaranteeingassembly system design and the AssemblyManufacturer, responsible for the final conformityof the switchboard.Project specification*Specifier> Specifies the needs andconstraints for design,installation, operation andupgrading of the completesystem.> Checks that itsrequirements have been fullyintegrated by the AssemblyManufacturer. Depending onthe application, the specifiercould be the end-user or adesign office.OriginalManufacturerThe organisation that hascarried out the originaldesign and the associatedverification of an assemblysystem.Assembly SystemAssemblyManufacturer(Panel builder)The organisation (whetheror not the same as the OM)responsible for thecompleted assembly.He is responsible for"Routine verifications"on each panel produced,according to the standard.If he derivates from theinstructions of the originalmanufacturer he has to carryout again design verifications.Tested AssemblyEnd-UserShould ask for a certifiedLV switchboard.By systematically requestingroutine verifications,he ensures that the assemblysystem used is compliant.He is responsible for the"Design verifications" listed byIEC 61439-2 including manyelectrical tests.* <strong>Schneider</strong> <strong>Electric</strong> has developeda specification guide.17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!