EXECUTIVE SUMMARYAll information in <strong>the</strong> Executive Summary should be drawn from <strong>the</strong> detailedinformation in <strong>the</strong> full report. The Executive Summary should contain a briefdescription <strong>of</strong> <strong>the</strong> preliminary audit including:• Name <strong>of</strong> <strong>the</strong> audited institution, location <strong>of</strong> facility or building audited• Objective <strong>of</strong> audit• Dates <strong>of</strong> preliminary audit• Key systems and equipment studied2