13.07.2015 Views

Energy Audit Report - the International School of Belgrade

Energy Audit Report - the International School of Belgrade

Energy Audit Report - the International School of Belgrade

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2. Monitoring PhaseThis phase involves obtaining detailed information pertaining to <strong>the</strong> overall site as wellas <strong>the</strong> major energy use categories. The operation <strong>of</strong> key equipment is inspected, andmeasurement <strong>of</strong> a range <strong>of</strong> parameters is undertaken where appropriate, including:Electrical & gas load pr<strong>of</strong>iles,Internal temperature/humidity,Ventilation rate,Light levels,Process specific monitoring.Feedback is also obtained from maintenance staff on issues concerning building andplant operation and maintenance which could well be impacting on energy efficiency aswell as occupant comfort.3. Analysis & <strong>Report</strong>ing PhaseThis phase involves:Determination <strong>of</strong> overall energy efficiency <strong>of</strong> complex; for example kWh/m2 perannum for <strong>of</strong>fice buildings, kWh or $/occupied room night per annum for hotels,kWh or $/item per annum for a manufacturing process,Determination <strong>of</strong> <strong>the</strong> greenhouse emission index,Life cycle cost analysis <strong>of</strong> various energy saving measures,Tariff analysis,Written report on findings.4. Post <strong>Audit</strong> PhaseThis phase involves <strong>the</strong> school acting on <strong>the</strong> <strong>Energy</strong> <strong>Audit</strong> <strong>Report</strong>. We should:Decide if a higher level <strong>of</strong> <strong>Energy</strong> <strong>Audit</strong> is required following a Preliminary <strong>Audit</strong>,Produce an action plan which prioritizes <strong>the</strong> recommended tasks, allocates rolesand contains a timetable for <strong>the</strong>ir completion,Consult with and educate staff about <strong>the</strong> action plan and <strong>the</strong> reasons forimplementing it,Regularly monitor <strong>the</strong> results <strong>of</strong> implemented actions and review <strong>the</strong> plan asrequired9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!