13.07.2015 Views

Energy Audit Report - the International School of Belgrade

Energy Audit Report - the International School of Belgrade

Energy Audit Report - the International School of Belgrade

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IIIScope <strong>of</strong> Work for Detailed <strong>Energy</strong> <strong>Audit</strong>• Phases <strong>of</strong> work intended• Brief description <strong>of</strong> what will be done at each stage <strong>of</strong> <strong>the</strong> energy audit and whatwill be achieved• Duration <strong>of</strong> each phase• Personnel involved at each phase• Proposed instrumentation plan in detail• A layout <strong>of</strong> <strong>the</strong> proposed location <strong>of</strong> installation <strong>of</strong> instruments and sensors,preferably with picturesThere are generally 4 phases to an <strong>Energy</strong> <strong>Audit</strong>:1. Investigation Phase2. Monitoring Phase3. Analysis & <strong>Report</strong>ing Phase4. Post <strong>Audit</strong> Phase1. Investigation PhaseThis phase involves Facility Manager collecting available relevant data concerning:Reason for <strong>the</strong> <strong>Energy</strong> <strong>Audit</strong>,Level <strong>of</strong> audit required,Date <strong>of</strong> required completion,<strong>Energy</strong> consumption for <strong>the</strong> past 1 to 2 years,Tariffs and related energy supply contracts,Floor areas, staff numbers, production levels,Occupancy hours,Industry energy use/cost benchmark levels,Sub electrical and gas metering equipment,After-hours power usage,Mechanical plant configuration (e.g. air-conditioning plant rated cooling capacity,pump and fan motor kW ratings and efficiency); as-installed drawings, electricalsingle line drawings, and operational & maintenance manuals,Lighting configuration (i.e. lamp number & fitting type, Wattage, ballast type),condition and controls,Compressed air system (if present) including rating, presence <strong>of</strong> air leaks, hours<strong>of</strong> usage,Steam and hot water boilers,Building Management Systems, control strategies and maintenance schedules,Building envelope, shading, orientation, insulation levels,Asset management plan, if any.8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!