13.07.2015 Views

Addendum - tripura state co-operative bank

Addendum - tripura state co-operative bank

Addendum - tripura state co-operative bank

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Tripura State Co-<strong>operative</strong> Bank Ltd.RFP Clause5.4.1.1 Training: 4 additional training batches with 25persons per batch will be <strong>co</strong>nsidered for the ‘<strong>co</strong>reteam training’ for understanding the solution andparameterisation requirements and two additionalbatches with 25 persons in two batches for ‘trainthe trainers training’. 10 additional batches with25 persons per batch will be <strong>co</strong>nsidered for ‘enduser training’. Per Person per man-day <strong>co</strong>st for 50man-days for other training also has to be quoted.Revised clauseRefer revised 6.1.5.13above for the revisedtraining schedule. Theadditional requirement oftraining is also revised asunder:1. End User: 2additional batchesof 15 users each.2. Core Team: 1additional batch of15 users each.3. Train the trainers: 1additional batch of10 users each.All other <strong>co</strong>nditions aresame.2.3.14.1The SI should size for adequate hardware basedon the transaction volumes for the Core BankingApplication & Database. The Centralized BankingApplication & Database should be sized forindividual Active-Passive cluster solutions at DC &Active-Passive cluster at the DRC.The SI should size foradequate hardware basedon the transactionvolumes for the CoreBanking Application &Database. The CentralizedBanking Application &Database should be sizedfor individual Active-Activecluster solutions at DC &Active-Passive cluster atthe DRC.2.3.9.10Vendor to size bandwidth of entire WAN network,that includesLink between DC and DRC• Link between MPLS cloud to DC and DRC,• Link between Branches and MPLS VPN cloud.• Link between Zonal Offices to MPLS VPN Network• Link between VSAT Hub location to DC and DRCfrom two seperate SP’s• The shared pool bandwidth (for VSAT sharedlocations).Link between DC and DRC• Link between MPLS cloudto DC and DRC from SP1and SP2,• Link between Branches andMPLS VPN cloud.• Link between Zonal Officesto MPLS VPN Network• Link between VSAT Hublocation to DC (SP1 & SP2)and DRC (SP1/Sp2)• The shared poolbandwidth (for VSAT6 | P ageThe terms, <strong>co</strong>nditions and specifications of Bidding Document & Amendment issued till date stand modified to the extentindicated under <strong>co</strong>lumn “Modification/Additions/Deletion”. All other terms & <strong>co</strong>nditions, stipulations, specifications etc. of theBidding Document and Amendments issued earlier shall remain unaltered.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!