13.07.2015 Views

2007 Responsibility Report - English (PDF) - Barrick Gold Corporation

2007 Responsibility Report - English (PDF) - Barrick Gold Corporation

2007 Responsibility Report - English (PDF) - Barrick Gold Corporation

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OFF-SITE SPILLS:Operation Substance Amount Remedial ActionEskay Creek Ethylene glycol 390 Liters Ethylene glycol leaked from a failed seal on a recirculation pumpand spilled into a power generation station sump. From thesump, it flowed into the facility’s treatment ponds where it wasdischarged to a creek. The pump was replaced and watersamples taken. Results showed there was no impact to the creek.Hemlo Tailings slurry 11.0 millionLitersFailure of a tailings pipeline caused slurry to be released into acontainment area and an un-permitted area. The tailings materialwas removed and the tailings pipeline was repaired with severalsections upgraded. There were no long-term consequences tothe environment.North MaraTwo separatespills ofuntreated water9.4 million Liters 1. Overflow of water from the tailings dam sediment trapoccurred due to vandalizing of the pump. The pump wasrepaired and the water pumped back into the tailingsstorage facility. The water was tested and did not containany contaminants.2. Overflow of water from the Nyabiriama sediment trapoccurred due to vandalizing of the pump. The pump wasreplaced. No remedial action was required.North Mara Process water 1.7 million Liters Vandals opened a valve on a leachate pipeline. Water leaked intoa containment pond. Some dead fingerlings were discovered inthe river. The valve was repaired and water sampling completed.Remediation is ongoing.North Mara Hexamine nitrate 20,000 Liters Hexamine nitrate spilled from a transport vehicle outside themine area. The area was thoroughly cleaned.HomestakeTwo separate17.7 million1. Untreated seepage bypassed the water treatment plant overClosure Projectspills ofLitersan eight-day period due to substantial rains and subsequentuntreatedrunoff in the area. The seepage water was sampled andseepageconstituents were below permit levels. There was no furtherremedial action.2. Untreated seepage (3,700 Liters) bypassed the water treatmentplant due to an upset condition caused by a frozenpipeline. The water discharged into a collection sump whichsubsequently overflowed into a creek. The pipeline was thawed,a level sensor and emergency shut-off valve were installed andnew operating protocols were instituted.HomestakeClosure ProjectUntreatedstorm water570,000 Liters Untreated storm water was released due to an open valveon a line to the water treatment plant over a 16 day period.Additional administrative protocols were put in place toprevent a recurrence.<strong>Barrick</strong> <strong>Responsibility</strong> <strong>Report</strong> <strong>2007</strong> 35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!