13.07.2015 Views

238-47104-00A - Bradford White

238-47104-00A - Bradford White

238-47104-00A - Bradford White

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SEQUENCE OF OPERATIONSequence of Operation- Double Element, Simultaneous Operation, 3 Phase.1Line voltage is applied across terminals L1& L3 of upper thermostat. Line voltage alsoextends to terminal L1 of lower thermostat.Also, line voltage is applied to terminal L3of lower thermostat. ECO in both upper &lower thermostat is closed, so there isvoltage at terminal L4 of both thermostatsand to one side of both upper & lowerelements.1 2ECOClosedThermostat closedat terminal T22Tank is cold therefore both thermostatsare closed at terminal T2 (calling for heat).This completes the circuit through thethermostats and allows current to flowthrough the elements.ECOClosedThermostat closedat terminal T23When either thermostat is satisfied, it willopen at terminal T2, interrupting currentflow through the corresponding element. Asboth thermostats satisfy, the system will bein stand-by mode waiting for the next callfor heat. Thermostats will operateindependent of the other.Thermostat openat terminal T23Thermostat openat terminal T2Page 1010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!