13.07.2015 Views

SACE Emax DC: Direct Current Applications - VAE ProSys sro

SACE Emax DC: Direct Current Applications - VAE ProSys sro

SACE Emax DC: Direct Current Applications - VAE ProSys sro

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Protection Releases and Trip CurvesMeasurementsMeasurement FunctionsThe measurements available on electronic releases PR122/<strong>DC</strong> and PR123/<strong>DC</strong> fitted by the ModbusCommunication module PR120/D-M and the protocol converter for Profibus and Devicenet FieldBusEP010-FBP are listened on the following table.Communication functionsPR122/<strong>DC</strong> PR123/<strong>DC</strong> PR122/<strong>DC</strong>-PR123/<strong>DC</strong>+ PR120/D-M + PR120/D-M + PR120/D-Mand EP010Protocol Modbus RTU Modbus RTU FBPPhysical layer RS-485 RS-485 Profibus-DP orDeviceNet cableMaximum baudrate 9200 bps 9200 bps 5 kbpsMeasuring functions<strong>Current</strong>s ■ ■ ■Ground current ■ ■ ■Voltage ■ on demand (1)Power ■ on demand (1)Energy ■ on demand (1)Signalling from functionsLED: auxiliary power supply, warning, alarm ■ ■ ■Temperature ■ ■ ■Indication for L, S, I, G and other protection ■ ■ ■Available dataCircuit-breaker status (open, closed) ■ ■ ■Circuit-breaker position (racked-in, racked-out) ■ ■ ■Mode (local, remote) ■ ■ ■Protection parameters set ■ ■ ■Load control parameters ■ ■ ■AlarmsProtection L ■ ■ ■Protection S ■ ■ ■Protection I ■ ■ ■Protection G ■ ■Fault release mechanism failure ■ ■ ■Undervoltage, overvoltage (timing and trip) protection ■ on demand (1)Reverse power protection (timing and trip) ■ on demand (1)MaintenanceTotal number of operations ■ ■ ■Total number of trips ■ ■ ■Number of trip tests ■ ■ ■Number of manual operations ■ ■ ■Number of separate trips for each protection function ■ ■ ■Contact wear (%) ■ ■ ■Record data of last trip ■ ■ ■Operating mechanismsCircuit-breaker openi/close ■ ■ ■Reset alarms ■ ■ ■Setting of curves and protection thresholds ■ ■ ■Synchronize system time ■ ■ ■EventsStatus changes in circuit-breaker, protections and all alarms ■ ■ ■(1) please ask ABB for further details22ABB <strong>SACE</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!