The following table outlines the recommended actions and thelead and supporting agencies responsible for implementingeach of the actions outlined in the Revised <strong>Strategic</strong> <strong>Plan</strong>.The anticipated timeframe for completing each item is alsoincluded, with the timing to be defined as follows:The timing for actions that have no specific timeframe will benoted as being Ongoing or As Required. These items will havea priority (Low, Medium or High) allocated to them to assistwith prioritising actions.• Short Term – 0 to 3 years.• Medium Term – 4 to 7 years.• Long Term – 8 to 10 years.Implementation <strong>Plan</strong> for Revised <strong>Strategic</strong> <strong>Plan</strong> actionsNo. Action Lead Agency SupportingAgencyStudy Area WidePriorityTimingA1Consider the anticipated impacts of climatePVDPCDHighOngoingchange in planning for the future protectionof the foreshore and any potentialdevelopment in accordance withHBCCPOMCDSECCBState policy.A2Consider opportunities to provide additionalHBCCShort Termshade throughout the study area in line withthe Hobsons Bay City Council HeatwaveStrategy 2009-<strong>2010</strong>.A3Review existing heritage studies to ensureHBCCDPCDShort Termall relevant features/places within the studyarea have been assessed and follow upany identified features/places that warrantPOMCPVHVAAVfurther protection.A4Address stormwater drainage issues andHBCCPVLong Terminvestigate the potential for Gross PollutantTraps (GPT) to be installed in line with thePOMCHobsons Bay Stormwater Management<strong>Plan</strong> 2006.A5A6Undertake further detailed investigations todetermine the location and feasibility of theMaritime Servicing Facility within the StateMarine Precinct.Ensure any new development/facilities areof low scale and complementary to existingactivities and facilities.PV HBCC Short TermHBCC DPCD High OngoingA7Rationalise and co-ordinate the numberPVDOTShort Termand style of signage along the foreshoreand improve information to highlight theproximity of public transport.HBCCPOMCiii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!