13.07.2015 Views

WKES3180 – LATIHAN ILMIAH 2 Session 2009/2010 ... - DSpace

WKES3180 – LATIHAN ILMIAH 2 Session 2009/2010 ... - DSpace

WKES3180 – LATIHAN ILMIAH 2 Session 2009/2010 ... - DSpace

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FCSIT, University of Malaya1.7 Project ScheduleThe project started from 5 th of January <strong>2009</strong> and ended on 5 th of November <strong>2009</strong>. There aprecise schedule plan is needed to complete the project within the timeline. Figure 1.1 shows a Ganttchart for the development of the project within the estimated time in order to complete every task thatwe have identified.Figure 1.1: Gantt Charta. Article Review• Find relevant article and journals about the project title• Read through each article found• Summarize 3 most relevant articlesb. Project Initiation• Understanding the project• Determine the problem statement and objective to be achieved• Reviewed previous project report for project outline referencesc. Literature Review• Analysis, research and summarize 3 articles or journals which is relevant to the title ofthe project• Determine the tools to be used for this project like framework, database andmultimedia• Finalize the comparison and select appropriate tools from the comparison result.4 | P a g e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!