13.07.2015 Views

WKES3180 – LATIHAN ILMIAH 2 Session 2009/2010 ... - DSpace

WKES3180 – LATIHAN ILMIAH 2 Session 2009/2010 ... - DSpace

WKES3180 – LATIHAN ILMIAH 2 Session 2009/2010 ... - DSpace

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FCSIT, University of Malayad. Requirement Analysis• Identify the functional and non – functional requirement of the systems• Determine the suitable methodology for the system to meet the functional and nonfunctionalrequirement within the project timelinee. System Design• Identify the system design goal• Convert the functional and non-functional requirement of the system into systemrepresentation like diagrams or chart• Draw a suitable UML diagram to model the system architecture design of the systemf. System Development• Develop the system modules according to the system design using the selectedprogramming language, multimedia tools and database decided in the earlier phase• After develop all the system modules, combine all sub modules and modules to becomea fully functional systemg. System Testing• Conduct a system testing on the system – white box testing and black box testing• Conduct a user acceptance test for the system before dateline• While conducting system testing, debug the system if bug(s) is found during the testh. Maintenance• Maintain the system from time to time by solving the system fault• Add new features to the system when necessary• Maintain the database of the system from time to time and backup if neededi. Documentation• Document the entire system development process• Finalize all document gather which is relevant to the project.5 | P a g e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!