13.07.2015 Views

MODULE #1 Baseline Documentation Report Training Module

MODULE #1 Baseline Documentation Report Training Module

MODULE #1 Baseline Documentation Report Training Module

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

i. ACA – Prepare, plant, and maintain2. To enhance reproductive habitat to benefit upland game birds by 2018.Strategic Actions:a. Establish a minimum of 40 acres of nesting and brood rearing cover beginning in2011i. ACA – Prepare, plant, and maintain3. To enhance security cover and movement corridors to benefit upland game birds by2018.Strategic Actions:a. Establish travel and escape cover to provide connectivity to the surroundinglandscape beginning in 2012.i. ACA – Prepare, plant, and maintain4. To maintain existing habitat and enhancement areas to benefit upland game birdsthrough 2018.Strategic Actions:a. Maintain shelterbelts in a cultivated state to reduce weed and grass competition.b. Determine appropriate flow of water to maintain wetlandc. Control weeds and vegetation in an appropriate mannerRECREATIONAL OBJECTIVESRecreational objectives were identified that will allow for the safe and sustainable use of thisproperty. Primarily these objectives relate to the creation of a parking area, installation of sitesignage to increase ACA and partner profiles, general maintenance of the site, and barriers toundesired vehicular and OHV traffic across the property.Objectives:1. To ensure safe and sustainable recreational access is available to the conservation siteby 2009.Strategic Actions:a. Widen access road on NW corner of property by October 1, 2009.b. Develop a fenced in parking area to restrict vehicular access by October 1, 2009.c. Install locked gate at SW access.for maintenance equipment only by October 1,East Hayes Management Plan11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!