13.07.2015 Views

KOLKATA _NIT - WBSEDCL

KOLKATA _NIT - WBSEDCL

KOLKATA _NIT - WBSEDCL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

IB.9.4.Withdrawal / modification of a bid during the interval between the deadline for submission ofbids and the expiry of the period of bid validity specified by the bidder shall result in forfeitureof the Bid Security deposit.IB.10. Phasing of Execution: Deployment of manpower may be made in phases based onextension & expansion of work. The tentative initial and final unit-wise requirement ismentioned in GTC.4. Inception may take place within a specified time-frame as specifiedelsewhere in this document and well within the contract period.IB.11. Opening of Bid:IB.11.1. Price Offer-:IB.11.1.1.IB.11.1.2.IB.12. Evaluation Of Bids:Date of opening shall be on 18/01/2012 AT 15-00 hr at the Meeting room of DistributionHQ., 1 st Floor, D-Block, Biduyt Bhaban, Salt Lake, Kolkata – 700 091.The Offer will be opened in the presence of bidders’ authorized representative ((Only Onerepresentative per bidder) who may like to attend. Any change in the schedule, due to anyunforeseen reasons, will be duly communicated to the bidders through website.IB.12.1. All pre requisite parameters along with Bid Security will be checked before opening of 1 st partof the Tender. On that date of opening, only the 1st. part of the bid will be opened forprocessing.IB.12.2. Negative deviation in offer, if any, may be liable for rejection of the concerned bidder’s offer, ifthe said bidder does not agree to match the offer with the desired laid down Commercial &Technical terms.IB.12.3. Only after completion of the evaluation of 1 st part, the 2 nd part will be opened for thosebidders who will qualify after the 1 st part screening.IB.12.4.IB.12.5.IB.13.IB.13.1.IB.13.1.1.IB.13.1.2.IB.13.1.3.No alteration shall be made in the Bid forms and schedules except filling in the blanks asdirected. If any alteration is made or if these instructions are not fully complied with, the Bidmay be rejected at the sole discretion of <strong>WBSEDCL</strong>. The authorized signatory must initial anyerasing or other changes that appear on the document.Evaluation of bid will be made based on the composite cost considering declared specificheads in all categories, as indicated in the Price Bid Sheet.Rectification of Errors:Arithmetical errors, if any, shall be rectified as follows:If there is a discrepancy between the unit price and total price that is obtained by multiplyingthe unit price and quantity, the unit price shall prevail and the total price shall be accordinglycorrected by <strong>WBSEDCL</strong>.If there is a discrepancy between words and figures, the amount in words shall prevail.Bidder shall ensure that the prices furnished in various price schedules are consistent witheach other. In case of any inconsistency in the prices furnished in the specified priceschedules, <strong>WBSEDCL</strong> is entitled to consider the higher of the ‘quoted’ price and the‘corrected’ price as resulting from aforementioned procedure for the purpose of evaluation ofbid. For the purpose of award of contract the lower of the ‘quoted’ price and ‘corrected’ pricewill be considered.IB.14. Statutory Obligations:IB.19.1 The service provider must comply with all statutory obligations & provisions as per law of theland and as contained in relevant Acts like, Workmen’s Compensation Act 1923, the ContractLabor (Regulation & Abolition) Act 1970, Employees Provident Funds and MiscellaneousProvisions Act 1952, Employees’ State Insurance Act 1948, Payment of Wages Act 1936 etc.and rules made there under for every Act.IB.19.2 The financial obligation(s) arising out of statutory obligations would be entirely on contractorsaccount and <strong>WBSEDCL</strong> will not be responsible on this score for any reason whatsoever. TheCCEE DD/ //ZZCC CC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!