13.07.2015 Views

Mathematical modeling

Mathematical modeling

Mathematical modeling

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Profit produced from each 240-m 2 home = LE 18,000Maximum fund available for construction = LE 500,000One-third of the hoses should be from the 240-m 2 type.Maximize 15000x 1 + 18000x 2Subject to 6000x 1 + 9000x 2 ≤ 450000x 2 ≥ 0.33(x 1 + x 2 ) or -0.33x 1 + 0.67x 2 ≥ 0x 1 , x 2 ≥ 0As shown in the following figure, the number of 200-m 2 homes is 43 homes, while thenumber of 240-m 2 home is 21 homes, which satisfies a maximum profit of LE 1,029,399.15000x 1 + 18000x 2 = 10293996000x 1 + 9000x 2 ≤ 450000Feasible regionOptimum solution(43.13, 21.24)-0.33x 1 + 0.67x 2 ≥ 02.8.3 Example 3Resolve example 2.8.2 using the Solver program of Excel.SolutionFirst, set the modelin Excel spreadsheetprogram as follow:The solution is shown in the following figure.Systems Analysis 39 Dr. Emad Elbeltagi

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!