13.07.2015 Views

NAVSEA Update - NSRP

NAVSEA Update - NSRP

NAVSEA Update - NSRP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Retention of Preconstruction Primer Under Single Coat PaintIDEA:Allow retention of preconstruction primer (PCP) in in fuel oil storage, fuel oil service, compensated fuel anddiesel tanks, as well as ballast tanks, voids, plenums, bilges, and CHT tanks and under MIL-PRF-23236, TypeVII, Class 5/18, 7/18, and 13/18 systems.RISK:Low/moderate, with <strong>NAVSEA</strong> leaving forward with risk of coating failure due to blistering or delaminationbefore 12-years. Risk is mitigated by commercial practice and MSC.REFERENCE:<strong>NSRP</strong> project conducted at HII Gulf Coast.Technical Requirements to Allow PCP RetentionMaterial:PCP shall be a silicate-zinc “weld through” primer that is approved by final coating system vendor.OQE: Letter from vendor, or notation on ASTM-F-718 data sheet.Surface preparation:SSPC SP-10 with sharp, angular media. Surface profile 2-4 mils with no single reading in excessof 5-mils or below 1-mil.OQE: Contractor with ISO 9001 process verification once per shift. SUPSHIP may conductrandom inspection.Application:Installation:PCP shall be applied and cured in accordance with manufacturer requirements, including thickness.Relative humidity shall not exceed 85%.OQE: ISO 9001 process verification once per shift. SUPSHIP may conduct random inspection.All retained PCP shall be subject to secondary surface preparation within 48-hours of epoxy primerapplication by brush-off blasting to SSPC-SP 14. Sound PCP may be retained on up to 10% of thesurface area as defined in SSPC SP-14. Any previously rusted areas where the original surface profilehas deteriorated shall be abrasive blasted to SSPC SP-10 to re-establish the required surface profile.OQE: Government check point for final surface cleanliness to include visual inspection as per SSPCSP-1 and/or SSPC SP-7. Government may use ASTM-F-21/22 water break test to validate SSPC SP-1.First Coat Paint:A minimum of one coat of rapid-cure, single-coat paint required on all surfaces. PCP thickness tonot change established DFT requirements.OQE: As per established contract.13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!