Contents - Archon Engineering Consultants Home Page
Contents - Archon Engineering Consultants Home Page
Contents - Archon Engineering Consultants Home Page
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2) Design of Plumbing and Fire Fighting Systems as per British & NFPA<br />
standards.<br />
3) Preparation of shop drawings, Bill of quantities & schedules in line with<br />
specification, contract & project requirement.<br />
4) Preparation & scrutiny of material submittals as per specifications.<br />
5) Co-ordination with main contractor & consultants for approval of shop<br />
drawings & submittals.<br />
6) Preparation of method statements for installation.<br />
7) Negotiation with all equipment suppliers.<br />
� Worked with ETA <strong>Engineering</strong> Ltd, as Assistant Manager – Planning from<br />
November 2000 to October 2001.<br />
� Nature of work:<br />
1) Design of HVAC System<br />
2) Preparation of shop drawings & bill of quantities<br />
3) Preparation of material submittals according to specification.<br />
4) Co-ordination with consultants & contractors for approvals<br />
5) Preparation of schedules and bar charts to suite civil program.<br />
6) Preparation of method statements for installation.<br />
7) Negotiations with suppliers.<br />
8) Handling, Guiding and motivating a team of site engineers, supervisors<br />
and technicians.<br />
� Major projects handled.<br />
1) Osho Development Hotel Complex, Pune – 400 TR centralized airconditioned<br />
hotel with primary & secondary pumping system with<br />
Variable Frequency Drives.<br />
2) Wipro Technology center, Pune – Technology center with 350 TR<br />
centralized air conditioning.<br />
3) Jahangir Hospital, Pune. - 575 TR centralized air conditioning system with<br />
operation theaters & clean room applications.<br />
4) Lupin Labarotaries, Pune – 1200TR Industrial air conditioning for<br />
Pharmaceutical Industry with laboratory & clean room application.<br />
� Worked with Emirates Trading Agency as Design Engineer from November<br />
1997 to October 2000.<br />
� Nature of work:<br />
1) Design of centralized HVAC system, Plumbing & fire fighting as per<br />
ASHRAE, NFPA standards & local codes.<br />
2) Preparation of shop drawings & bill of quantities<br />
3) Preparation of material submittals according to specification.<br />
4) Co-ordination with consultants & contractors for approvals<br />
5) Preparation of schedules and bar charts to suite civil program.<br />
6) Preparation of method statements for installation.