03.12.2012 Views

Contents - Archon Engineering Consultants Home Page

Contents - Archon Engineering Consultants Home Page

Contents - Archon Engineering Consultants Home Page

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

� Major Projects Handled<br />

1) Al Ahli Tower<br />

2) Kendah House<br />

3) Caterpiller Factory<br />

4) TD-15 – Dubai International Airport<br />

� Also involved in designing of complete Mechanical system for<br />

1) Marina Mall, Abu Dhabi (for air conditioning)<br />

2) Bakhit al Bakhit – B+G+M+15 storied building in Sharjah. – Designing of<br />

HVAC system with heat load calculations, equipment selection & layouts<br />

for HVAC, Plumbing i.e. water supply, drainage as per British standards.<br />

& Firefighting as per NFPA.<br />

� Worked with Tata Consulting Engineers from July 1997 to November 1997 as<br />

Engineer – HVAC services.<br />

� Nature of work:<br />

1) Design of HVAC System<br />

2) Selection of equipment based on design parameters<br />

3) Preparation of overall service scheme.<br />

4) Selection & narration of specification<br />

� Job Involved: Essar Oil refinery – Gujarat, India.<br />

� Worked with Kirloskar Pneumatic <strong>Engineering</strong> Ltd, Pune As Project<br />

Engineer from September 1994 to June 1997<br />

� Nature of work:<br />

1) Design of refrigeration & central & package air-conditioning system.<br />

2) Preparation of drawings as per design<br />

3) Coordination with consultant for drawing approval<br />

4) Preparation of detailed Bill of Quantities<br />

5) Coordination with execution department.<br />

6) In charge of Package division for all over India.<br />

� Major Projects handled:<br />

1) Whirlpool factory with Central Air-conditioning, Pune- 600TR chilled<br />

water system & ventilation for factory area<br />

2) All India Radio station, Jabalpur<br />

3) NOCIL with brine chilling application (-30 o C) application, Bombay<br />

4) Centak Chemicals (-39 o C) brine chilling plant at Mahad.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!