13.07.2015 Views

Sepam series 10 - Schneider Electric

Sepam series 10 - Schneider Electric

Sepam series 10 - Schneider Electric

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Sepam</strong> Series <strong>10</strong> - InstallationMounting InstructionSelect a CT with a diameter at leasttwice the size of the cable harnessgoing through it.IllustrationGroup the cable(s) in the middle ofthe CT and use non-conductingbinding to hold the CT in placearound the cable harness.Do not bend the cable(s) close to theCT: Install the CT on a straightsection of the cable(s) that is at leasttwice as long as the CT diameter.Remember to pass the shieldearthing braid on the 3 cables backthrough the CT.Check that the braid goes the rightway through the CT.A B CA B CConnectionCharacteristicsCT Wiring Type ofTerminalCSH120,CSH200• 1..2.5 mm 2 wire (AWG 18...12)• Stripped length: 8 mm (0.31 in)GO1<strong>10</strong> • Wire 1.5...6 mm 2 (AWG 16...<strong>10</strong>)• Lug with inner diameter 5 mm (0.2 in)ToolsM3.5 screw Flat bladescrewdriver3.5 mm (0.14 in)M5 screwFlat spanner forM5 nutTightening Torque0.8...1 N•m(7.1...8.8 lb-in)30 N•m (0.34 lb-in)SEPED307003 02/2008 49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!