13.07.2015 Views

technical specification for consultancy services for civil - BHEL ...

technical specification for consultancy services for civil - BHEL ...

technical specification for consultancy services for civil - BHEL ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TECHNICAL SPECIFICATION FORCONSULTANCY SERVICES FOR CIVIL,STRUCTURAL & ARCHITECTURAL WORKS FORCHP PACKAGE2X520 MW VIZAG THERMAL POWER PROJECTSPECIFICATION NOIS-1-10-2000/ 005REV. 00SHEET Page 9 of 18upon Material Availability and Project Time Schedulerequirements. These may have to be resorted to even aftercompletion and approval of Construction / Fabrication drawings,without any extra cost to <strong>BHEL</strong>.viii)The Bill of Quantities <strong>for</strong> Major Civil and Structural items shallbe furnished in respective Construction Drawings.ix)Sub-Consultant shall be fully responsible <strong>for</strong> the adequacy of theDesign and Detailing. <strong>BHEL</strong> / Customer are checking and / orapproval shall not absolve Sub-Consultant of their responsibility <strong>for</strong>Design, its Correctness and Commercial Risk attendant to thesame.x) Sub-Consultant shall also accept the Deletion of any work of thePresent Scope subject to maximum of 10% of the Contract Price<strong>for</strong> Civil & Structural Works.xi)xii)xiii)All requirements given in the owner’s <strong>specification</strong>s are included inthe sub-consultant’s scope, unless specifically excluded from thesub-Consultant’s scope.Any comment received even after approval of design and drawingshall be incorporated by the Sub-Consultant and revise the design& drawing, if necessary, at no extra cost.Sub consultant shall use <strong>BHEL</strong> standard analysis, design anddetailing procedures, wherever provided by <strong>BHEL</strong>.3.0 TIME SCHEDULE FOR COMPLETION OF ACTIVITIESDetailed design and release of construction drawings shall match theconstruction schedule.VIZAG THERMAL POWER PROJECTThe last Date <strong>for</strong> Completion of detailed Engineering (DCE) includingrelease of all construction drawings shall be MAR 2012 However theDate <strong>for</strong> Completion of Contract (DCC) shall be MAR 2013 <strong>for</strong> submissionof As Built Drawings.It shall be the Sub-Consultant’s responsibility to engage requisitemanpower, provide requisite interface inputs <strong>for</strong> design in <strong>BHEL</strong> unit’sscope and also to check the interface documents from <strong>BHEL</strong> – units andvendors to maintain progress as per schedule.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!