03.12.2012 Views

ordinance amending chapter 23 of the municipal - City of Appleton

ordinance amending chapter 23 of the municipal - City of Appleton

ordinance amending chapter 23 of the municipal - City of Appleton

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UTILITIES COMMITTEE MEETING<br />

JUNE 7, 2011<br />

Page 2<br />

Alderperson Baranowski stated he appreciated <strong>the</strong> projections and what individual<br />

utilities could cost over <strong>the</strong> next five years. Chairperson Jirschele reminded Committee<br />

that this is a forecast only; it has not been approved by anyone.<br />

b) Adopt Alternative 4 <strong>of</strong> <strong>the</strong> Kensington North Drainage Study prepared by AECOM.<br />

MOTION: Motion made by Alderperson Baranowski, seconded by Alderperson Jirschele to adopt<br />

Alternative 4 <strong>of</strong> <strong>the</strong> Kensington North Drainage Study prepared by AECOM. (4/0)<br />

Comments: Stormwater Engineer Sue Olson reviewed <strong>the</strong> figures in <strong>the</strong> agenda packet. The figures<br />

compare 10-year and 100-year storm events for both existing conditions and using<br />

alternative 4.<br />

Alternative 4 includes a one acre pond at <strong>the</strong> nor<strong>the</strong>ast corner <strong>of</strong> Express Court and<br />

Kensington Drive, a one acre pond on <strong>the</strong> <strong>Appleton</strong> Papers property, and increases <strong>the</strong><br />

storm sewer pipe diameter to 48” on Warehouse Road. This alternative will eliminate<br />

<strong>the</strong> problem areas at Menards, <strong>the</strong> Express Court intersection, and Warehouse Road.<br />

There were no cost effective alternatives to address ponding north <strong>of</strong> Newberry Street.<br />

Engineer Olson stated that staff has spoken to <strong>Appleton</strong> Papers regarding existing<br />

conditions and study alternatives. They have indicated <strong>the</strong>y have not experienced<br />

ponding that affected <strong>the</strong>ir buildings or operations. Staff is not recommending <strong>of</strong>ficial<br />

mapping <strong>of</strong> <strong>the</strong> proposed pond on <strong>the</strong> <strong>Appleton</strong> Papers property at this time since<br />

ponding experience does not appear to be significant. <strong>Appleton</strong> Papers is aware <strong>of</strong> <strong>the</strong><br />

option on <strong>the</strong>ir property so <strong>the</strong> option will remain open to work with <strong>the</strong>m in <strong>the</strong> future<br />

for any redevelopment opportunities or issues in <strong>the</strong> future.<br />

Engineer Olson stated <strong>the</strong> purpose <strong>of</strong> getting Alternative 4 adopted is to put it in <strong>the</strong><br />

books which will allow staff to work closely with a future developer to meet both <strong>the</strong>ir<br />

needs and <strong>the</strong> public needs for reduced ponding.<br />

c) Reaffirm <strong>the</strong> Theodore Street / East High Stormwater Project final design and bidding in 2011.<br />

Review bid prices received in October 2011 for final determination if project is a go.<br />

MOTION: Motion made by Alderperson Baranowski, seconded by Alderperson Hill to reaffirm <strong>the</strong><br />

Theodore Street / East High Stormwater Project final design and bidding in 2011 and to<br />

review bid prices received in October 2011. (4/0)<br />

Comments: Director Vandehey stated bids will be received in October 2011 and Committee can<br />

decide at that time to go ahead with <strong>the</strong> project. She stated that if <strong>the</strong> project is<br />

postponed too long, East High will do <strong>the</strong>ir parking lot and may not allow it to be dug up<br />

or <strong>the</strong> <strong>City</strong> will not be able to afford to dig it up and <strong>the</strong> project won’t be done. The<br />

opportunity to do <strong>the</strong> project is concurrent with <strong>the</strong> parking lot project.<br />

d) Request approval <strong>of</strong> electronic Compliance Maintenance Annual Report (eCMAR) for 2010<br />

(attachment) and request <strong>the</strong> following Resolution by presented to <strong>the</strong> Common Council for<br />

approval:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!