Annex 4 - WBSEDCL
Annex 4 - WBSEDCL
Annex 4 - WBSEDCL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Tariff Petition 2008-09, 2009-10 & 2010-11Input to the EHT System (400 kV, 220 kV, 132 kV and 66 kV) -2006-07<strong>Annex</strong> 4 (i)(a) Own Generating StationsSl.No. Source of Supply Energy Delivered into the Grid System MU1 Thermal2 Hydel JHP 145.72RHP 229.32TCF 33.43Sub- Total - Hydro 408.473 Mini-Hydro From all Mini Hydro Power Station 20.174 Diesel 0.685 Gas 0.006 Wind 0.007 Renewable 0.008 Co-generation 0.009 Others PPSP 0.00Total 429.32(b) Energy Purchase - sources within the State1. NTPC( Farraka) 3409.592. WBPDCL EXISTING UNITS 13840.423. WBPDCL NEW UNITS 0.004. DVC- Mejia V & Grid supply 0.005 DVC (Short Term) 263.026 DPL (132 KV) 20.11TOTAL 17533.14(c) Energy Purchase - sources outside the State1. NTPC (KHSTPS) Stage I & II 508.142. NTPC (TSTPS) 613.813. NHPC (RANGIT & TEESTA - III, IV & V) 64.67PTC( CHUKHHA & KURICHHU & Short Term)4.769.675 TALA HYDRO ELECTRIC PROJECT 314.186 AEL -Peak20.727 TPTCL -Peak8 NVVNLTOTAL 2291.19(d) Others1. Green Power (Electrosteel, Nippon & Neora) 50.1352. GRID Loss -186.75132 Unscheduled Interchange -782.108Sub Total -918.72Total 19334.93West Bengal State Electricity Distribution Company Limited Page No -