13.07.2015 Views

Annex 4 - WBSEDCL

Annex 4 - WBSEDCL

Annex 4 - WBSEDCL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Tariff Petition 2008-09, 2009-10 & 2010-11<strong>Annex</strong> 4 (xi)Losses at 33kV and below -2010-11Loss CalculationMU1. Losses in 33 kV System and Connected Equipment(i) Total Energy delivered into 33 kV Distribution System from EHT S/Ss Aand other Generating Stations - 4(v) 17523(ii) Energy sold by HT direct sales at 33 kV - 4(vi) B 2879(iii) Energy Delivered into 11 kV and LT System from 33/11 kV S/Ss - 4(vii) C 13257Losses A - (B+C) 1387% Losses 100 x {A-(B+C)}/A 7.922. Losses in 11 kV and LT System and Connected Equipment(i) Energy delivered into 11 kV and LT Distribution System from 33/11 kV S/Ss - 4(vii) C 13257(ii) Energy delivered into 11 kV Distribution System and EHT S/Ss and other Gen. Stn. - 4(viii)-D 1 3259Loss for wheeling of power through CESC network - - D 2 0Net Energy delivered into 11 kV Distribution System and EHT S/Ss and other Gen. Stn. - 4(viii)-D D=D 1 +D 4 3259Total Energy delivered into 11 kV and LT Distribution System C+D 16516(iii) Energy sold by HT direct sales at 11 kV - 4(ix) E 3404(iv) Energy sold in the LT System - 4(x) F 10404Total Sales E+F 13808Losses {(C+D) - (E+F)} 2708% Losses {(C+D) - (E+F)}x100/ 16.39(C + D)West Bengal State Electricity Distribution Company LimitedPage No -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!