Annex 4 - WBSEDCL
Annex 4 - WBSEDCL
Annex 4 - WBSEDCL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Tariff Petition 2008-09, 2009-10 & 2010-11Input to the EHT System (400 kV, 220 kV, 132 kV and 66 kV) -2007-08<strong>Annex</strong> 4 (i)(a) Own Generating StationsSl.No. Source of Supply Energy Delivered into the Grid System MU1 Thermal2 Hydel JHP 115.06RHP 203.20TCF 49.33Sub- Total - Hydro 367.593 Mini-Hydro From all Mini Hydro Power Station 15.464 Diesel 0.735 Gas 0.006 Wind 0.007 Renewable 0.008 Co-generation 0.009 Others PPSP 387.91Total 771.70(b) Energy Purchase - sources within the State1. NTPC( Farraka) 2643.542. WBPDCL EXISTING UNITS 14974.083. WBPDCL NEW UNITS 126.214. DVC- Mejia V & Grid supply 0.005 DVC (Short Term) 160.716 DPL (132 KV) 0.007TOTAL 17904.54(c) Energy Purchase - sources outside the State1. NTPC (KHSTPS) Stage I & II 32.002. NTPC (TSTPS) 659.333. NHPC (RANGIT & TEESTA - III, IV & V) 105.414. PTC( CHUKHHA & KURICHHU & Short Term) 681.285 TALA HYDRO ELECTRIC PROJECT 1224.686 AEL -Peak0.667 TPTCL -Peak8 NVVNL9TOTAL 2703.36(d) Others1. Green Power (Electrosteel, Nippon & Neora) 92.062. GRID Loss -200.9253 Unscheduled Interchange -883.822Sub Total -992.69Total 20386.91West Bengal State Electricity Distribution Company Limited Page No -