Annex 4 - WBSEDCL
Annex 4 - WBSEDCL
Annex 4 - WBSEDCL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Tariff Petition 2008-09, 2009-10 & 2010-11<strong>Annex</strong> 4 (xi)Losses at 33kV and below -2007-08Loss CalculationMU1. Losses in 33 kV System and Connected Equipment(i) Total Energy delivered into 33 kV Distribution System from EHT S/Ss Aand other Generating Stations - 4(v) 13525(ii) Energy sold by HT direct sales at 33 kV - 4(vi) B 1939(iii) Energy Delivered into 11 kV and LT System from 33/11 kV S/Ss - 4(vii) C 10506Losses A - (B+C) 1080% Losses 100 x {A-(B+C)}/A 7.992. Losses in 11 kV and LT System and Connected Equipment(i) Energy delivered into 11 kV and LT Distribution System from 33/11 kV S/Ss - 4(vii) C 10506(ii) Energy delivered into 11 kV Distribution System and EHT S/Ss and other Gen. Stn. - 4(viii)-D 1 2362Net Energy delivered into 11 kV Distribution System and EHT S/Ss and other Gen. Stn. - 4(viii)-D D=D 1 +D 4 2362Total Energy delivered into 11 kV and LT Distribution System C+D 12868(iii) Energy sold by HT direct sales at 11 kV - 4(ix) E 2441(iv) Energy sold in the LT System - 4(x) F 7334Total Sales E+F 9774Losses {(C+D) - (E+F)} 3094% Losses {(C+D) - (E+F)}x100/ 24.04(C + D)West Bengal State Electricity Distribution Company LimitedPage No -