13.07.2015 Views

Identification of Coherent Generators Using Fuzzy C-Means ...

Identification of Coherent Generators Using Fuzzy C-Means ...

Identification of Coherent Generators Using Fuzzy C-Means ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

* T* T⎡ a Ymma a Y⎢⎢ ⎢* T T⎣( a Ymmt) YWhere subscript m denotes the coherent generators and subscript m t denotes the totalgenerators.5. Numerical AnalysisIn this section, the proposed method is applied on 14-Bus, 5 Machine IEEE System powersystem. The single line diagram <strong>of</strong> the IEEE 14-bus standard system is shown in Fig. (4). Itconsists <strong>of</strong> five synchronous machinesmtmtmmt⎤⎥⎥⎥⎦(27)Fig. (4) The single line diagram <strong>of</strong> 14-Bus IEEE systemAssume that an open circuit occurs at bus 4. Table (1) shows the calculated s i , i=1,…,6. Fig.(5) and Fig. (6) show the time responses <strong>of</strong> all generators during the fault. Assuming thevalues <strong>of</strong> error levels as a percentage <strong>of</strong> the maximum values <strong>of</strong> the proposed coherencycriterions as ε 1 =0.3 rad, ε 2 = 0.04 rad/sec, ε 3 =0.3 rad, ε 4 =0.02 rad/sec, ε 5 =0.4 rad and ε 6 =0.2rad/sec.; one can get that the coherent generators are G 1 , G 2 and G 3 .Fig. (5) The response <strong>of</strong> 14-Bus IEEE system after removing the bus no. 4 from the originalsystem10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!