13.07.2015 Views

RAYPAK REPLACEMENT INSTRUCTIONS - Pool Supply Unlimited

RAYPAK REPLACEMENT INSTRUCTIONS - Pool Supply Unlimited

RAYPAK REPLACEMENT INSTRUCTIONS - Pool Supply Unlimited

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page 7P/N 241416 Rev 1Effective: 10-01-10Replaces: NEWGASKET & NEW CIRCUIT BOARD NEW BEZEL INSTALLATIONNote: Disregard window gasket installation if already present.1. Remove backing on gasket and install adhesive side on the controlpanel bezel as shown in Fig. 16 & Fig. 17.2. Re-assemble with new board to plastic bezel using the three mountingscrews as shown in Fig. 18.REMOVE BACKINGGASKETADHESIVE SIDE TOPLASTIC BEZELFig. 16CLEARWINDOWLAY BEZELDOWNRE-ASSEMBLE WITH NEW BOARDMOUNTING SCREWSFig. 17Fig. 18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!