13.07.2015 Views

Mechanical Contractor jobs

Mechanical Contractor jobs

Mechanical Contractor jobs

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B Fabrication -do-C Erection -do-46Dismantling, Fabrication & erection of thefollowing with MS platesA Bottom portion of weight juice tank Per sq. mtr.B Scrappers of Dorr clarifier Per Pc.C Catcher bottle of Vac. filter Per bottleD Bottom of Dorr clarifier PMTF Mud tray of Vac. Filter Per trayG Mud tank bottom of vac. Filter PMT47Dismantling, Fabrication & erection of MSplates of Pan stationA Shell of Pans PMTB Pan tops -do-C Save-all Per save-allD Shell of Vac. Crystallizer PMTEBottom plates of Syrup & molasses tanks &conditionersPer sq. mtr.FSide plates of Syrup & molasses tanks &conditioners-do-GPan shell strengthening work with MS channels/angles/ MS plate ringsPer PanHTop cone strengthening work with MS channels/angles/ MS plate ringsPer coneIStrengthening of vapour line by inner sidePer vapoursupporting of angles/ pipesline48Dismantling, fab. & erection of coils ofhorizontal crystallizersADismantlingPer inch dia /mtr. lengthB Fabrication -do-C Erection -do-49ADismantling, fab. & erection of shaft ofcrystallizersDismantlingB Fabrication -do-C Erection -do-Per inch dia /mtr. length50Replacement of 3” MS coils (including bends,flange, etc.) of Vertical crystallizersPer inchdia/mtr. length

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!