5. Price-ResponsiveHydro Modeling (HTC)Phase 1: Gridview model was unable to simulateprice-responsive hydro• The flexible portion of hydro output shape was exogenouslydetermined using Partial Load Following (PLF)• Scaled hourly based on net load in generator’s zonePhase 2: ABB team is finalizing HydrothermalCo-optimization (HTC) module• At HTC reshapes a portion of hydro output based onhourly prices in model• Will allow hydro units to dispatch when marginalmarket prices are higher• Used at approx. 40 plants in NW <strong>and</strong> California(as indentified by TEPPC)Expected Effect:• HTC-dispatched Hydro generation will to displace morecostly gas resources in hours of high system need• Lower total system production costs & greater efficiency<strong>22</strong>