13.07.2015 Views

IASFRome_StatusReport - INAF-IASF-Roma

IASFRome_StatusReport - INAF-IASF-Roma

IASFRome_StatusReport - INAF-IASF-Roma

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>IASF</strong> <strong>Roma</strong> - STATUS REPORTfor the Visiting CommitteeRef: <strong>IASF</strong>-RM-VC-001/07DATA: 19 November 2007Page: 43/134Computing SystemsThe Institute computer facility is based on a diffuse computing capability ensured by ~250computers (includine Personal, Workstation and Server and Netwoek Server) all interconnectedto a local network at 100Mb/s with an external hubb with a speed of 2 Gb/s, both managed bythe centralised CNR service.Some of the servers (central computing, web, ftp, data archival) are available to all the Institutesclients includine staff members, guests, and scientists hosted by the dfferent research groups.Part of the Computing Facility is the INTEGRAL Computing Facility (CED) hosting the centralarchive composed by a cluster of 30 dedicated PCs and a storage cabability exceeding 50Terabytes, expandble up to 80 if necessary for the long lasting INTEGRAL Satellate, nowextended by ESA till 2012. All the data are provided by the INTEGRAL Science Data Centre(ISDC) in ECOGIA, Geveve, that is the central point for data acquisition, dissemination, storage,quick look and scientific analisys.Also for the AGILE satellite, placet in orbit the 23rd of April 2007, a similar system is underfinalisation. The AGILE computing facility added value is due to the use of a powerful GRIDfacility and the direct connection to the ASI-ASDC data CENTRE located at ESA-ESRIN,Frascati, a few Kilometers from <strong>IASF</strong>.<strong>IASF</strong> is partner, via the “Area di Ricerca di <strong>Roma</strong> Tor Vergata” to an European EconomicCommunity (CEE) dedicated project, co-shared by the Regione Lazio, with the target to testultra fast link. The initial test will be done at 100 Gb/s with the final target to reach 1 Tb/s asstandard speed link between Universities, Research Areas and private enterprises of the LazioLender our Instiutute belongs to.Buildings maintenance and upgrade: 3 years plan approuved by <strong>INAF</strong>Description of the workpackageCost estimat.(k€)Maintenance of the <strong>IASF</strong> building within the Area di Ricerca300(100k€/y for each year 2006-2007-2008)Upper stage of the building F (scope is to provide more300working space for laboratories and rooms for technologistsand technicians; 150k€/y, 2 years step)Segmentation of the electric power switch system of the60Building FMaintenance of the roof of building F 120Maintenance Laboratori of building F 16Upgrade of the “NASA regional Fototeca” located at <strong>IASF</strong> 15Acoustic noise shielded area 10Electromagnetic shielded Lab (for microcalorimetric scope) 40Total cost 86143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!