13.07.2015 Views

REACT 350® II - Energy Absorption Systems

REACT 350® II - Energy Absorption Systems

REACT 350® II - Energy Absorption Systems

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Inspect ShipmentBefore assembling the <strong>REACT</strong> 350 ® <strong>II</strong> system at a specified location, check the received partsagainst the shipping list supplied with the system. Make sure all parts have been received. TheSystem is shipped assembled. All assembly hardware can be found in the last Cylinder. ThePullout Assembly should be stored for post impact use.Assembly ProceduresNote: The drawing assembly package provided with the <strong>REACT</strong> 350 ® <strong>II</strong> system must beused with these instructions for proper assembly and should take precedence over thesegeneral instructions.1) Deploy Traffic ControlA traffic control plan appropriate to the complexity of the project should be prepared andunderstood by all parties before the <strong>REACT</strong> 350 ® <strong>II</strong> system is assembled. Follow the planset forth by the highway authority specifying the use of this system.Deploy the appropriate work zone safety devices prior to beginning the assembly and keepthem present through all phases of deployment.Warning: The correct safety equipment and traffic management systemapproved by the requisite highway authority must be used as required for anyassembly using the <strong>REACT</strong> 350 ® <strong>II</strong> system.www.energyabsorption.com Revision A July 2013www.highwayguardrail.com 22 All rights in copyright reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!