13.07.2015 Views

REACT 350® II - Energy Absorption Systems

REACT 350® II - Energy Absorption Systems

REACT 350® II - Energy Absorption Systems

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Post-Impact Instructions1. Deploy the appropriate traffic control devices to protect your crew.Warning: The correct safety equipment and approved traffic management mustbe used as required for walk-up inspections of the <strong>REACT</strong> 350 ® <strong>II</strong> system.2. Check to see that all anchor bolts have remained firmly anchored in the roadway surfaceand in the Concrete Backup, if applicable. Replace any anchors that are loose, broken,or pulled out.3. Clear and dispose of any debris inside the cylinders and on the site.4. Check the condition of the Cylinders. Any Cylinder that is cracked or otherwise damagedshould be replaced. Measure the minor axis of the Cylinders. Cylinders requirereplacement when the minor axis of the Cylinders measures 460 mm [18”] or less (SeeFigure 30).5. The <strong>REACT</strong> 350 ® <strong>II</strong> system must be pulled out to its original length after each impact.The Pullout Assembly must be attached prior to this procedure and removed and storedwhen finished (See Figure 31).Backing TubeP/N 6164071/2"x4"x4" BarWasherP/N 6092363/4" x 7 1/2" StudP/N 1175413/4" NutP/N 1159543/4" x 2" Heavy FlatWasherP/N 1180273/4" Eye NutP/N 115906Figure 31 - Pullout Assemblywww.energyabsorption.com Revision A July 2013www.highwayguardrail.com 42 All rights in copyright reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!