13.07.2015 Views

Safety Management - Port of Seattle

Safety Management - Port of Seattle

Safety Management - Port of Seattle

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF THECONTRACTDocument 00860 - <strong>Safety</strong> <strong>Management</strong>17. Personal Protective Equipment provided according to task (should be in form <strong>of</strong> PPEassessment): ________________________________________________________________________________________________________________________________________________________________________________________________________________________18. Description <strong>of</strong> public protection measures (including work outside barricaded areas):________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________19. Employee Disciplinary for non-compliance with set forth safety policies andprocedures will be consistent <strong>Port</strong> <strong>of</strong> <strong>Seattle</strong>’s disciplinary action matrix as describedwithin your safety orientation.20. Location <strong>of</strong> the Master Accident Prevention Program is available by contacting______________________________ at _____________________________.Contractor SignatureDateProgram <strong>Safety</strong> Director SignatureDateRev. 10/31/0600860-27 Tenant

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!