04.12.2012 Views

HYDRAULIKPRESSE - HANSA-FLEX Hydraulics Canada Inc.

HYDRAULIKPRESSE - HANSA-FLEX Hydraulics Canada Inc.

HYDRAULIKPRESSE - HANSA-FLEX Hydraulics Canada Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12/07<br />

06<br />

12<br />

14<br />

Issue 12/2007<br />

�������������������������������������������������������������������������<br />

<strong>HYDRAULIKPRESSE</strong><br />

Mining excavators<br />

Giants in oil sand<br />

Everything from one<br />

source<br />

Moulded hoses now<br />

also available<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Czech<br />

Republic<br />

Development in fast<br />

motion<br />

Mining excavators<br />

Giants in oil sand<br />

Page 6


CONTENT | IMPRESS<br />

Content<br />

Editorial 03<br />

XWORLD Off -Road Events – With a tiger on rough terrain 04<br />

Mining excavators - Giants in oil sand 06<br />

In conversation with Diethelm Kappe 10<br />

Everything from one source – Moulded hoses now also available 12<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Czech Republic – Development in fast motion 14<br />

<strong>HANSA</strong>-<strong>FLEX</strong> branch Nordhausen – A region undergoing upheaval 15<br />

Getting to the top with Magaziner – Adaptation of high-lift trucks 16<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Switzerland – <strong>Hydraulics</strong> service by helicopter 18<br />

Oil treatment made easy– An ABC: Which hydraulic fl uid is right? 20<br />

20 successful years in the hydraulics sector – Change in management at Willmann 22<br />

Quiz, Figures & Facts, Preview 23<br />

02<br />

<strong>HYDRAULIKPRESSE</strong><br />

Editor:<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Hydraulik GmbH<br />

Zum Panrepel 44 · 28307 Bremen<br />

Germany<br />

Phone: 0421 - 48 90 70<br />

Telefax: 0421 - 4 89 07 48<br />

E-Mail: info@hansa-fl ex.com<br />

www.hansa-fl ex.com<br />

Compilation: Dietbert Keßler, Enrico Kieschnick,<br />

Horst Otto (PAPP Werbeagentur)<br />

Layout: N. Staciwa<br />

Print: Berlin Druck · www.berlindruck.de<br />

Responsible for contents: Wolfgang Rink<br />

Frequency: Bimonthly<br />

Subscribe to the on our website.<br />

ISSUE DECEMBER 2007


ISSUE DECEMBER 2007<br />

Dear Reader,<br />

2007 is drawing to a close, and it has been a successful year for <strong>HANSA</strong>-<strong>FLEX</strong>. New branches both at home<br />

and abroad have been added to what is already a dense network. We only recently opened our 300th branch<br />

of the company, guaranteeing even greater proximity to the customer. And with <strong>FLEX</strong>XPRESS we are quickly<br />

on hand to help wherever there are urgent problems with hydraulics.<br />

Our customers tell us time and time again that besides such proximity and our strong focus on service, it is<br />

above all the outstanding commitment shown by all <strong>HANSA</strong>-<strong>FLEX</strong> staff that strengthens the reputation of<br />

our company as a system partner for hydraulics. Our clientele acknowledge such customer orientation by<br />

placing new orders and endowing us with increasing responsibility. Responsibility we are happy to take on<br />

as customer proximity is our guiding principle.<br />

A growth rate of more than 15 percent in 2007 speaks for itself. We are making every eff ort to safeguard such<br />

growth through development of the company. This also includes extending our product range. One new article<br />

in our programme is <strong>HANSA</strong>-<strong>FLEX</strong> moulded hoses, which we not only stock in many diff erent sizes but can<br />

also be manufactured according to customer specifi cations. You can fi nd out more on page 12 of this issue.<br />

We continue to do everything possible to make sure that all customers are fully satisfi ed with the support<br />

they receive. Whether extracting potash in Thuringia, at a diamond mine in South Africa or mining oil sand<br />

at an open pit in <strong>Canada</strong>. Whether quickly sending out a replacement hose line or off ering support to OEMs<br />

with fi nished subassemblies ready for installation directly on site.<br />

With our customer Terex Mining we are even going a step further. On page 6 we describe a tailor-made<br />

solution and show how <strong>HANSA</strong>-<strong>FLEX</strong> can off er effi cient help to its OEM customers directly at their works<br />

with the prompt manufacture of hose lines or curved pipes and a good stock of parts. <strong>HANSA</strong>-<strong>FLEX</strong> develops<br />

such service packages carefully tailored to the requirements of each customer in close cooperation with the<br />

company concerned to help them cut costs and also boost productivity and added value.<br />

As 2007 moves into 2008, we should like to thank our staff for their hard work and commitment giving new<br />

impetus to customer proximity. We also thank our customers for the trust they have put in our company. We<br />

wish you all health and success in the coming year.<br />

The Management Board<br />

The managing directors<br />

FOREWORD<br />

Editorial<br />

Uwe Buschmann Thomas Armerding<br />

<strong>HYDRAULIKPRESSE</strong><br />

03


XWORLD<br />

Mud splashes against the windscreen. The massive<br />

tread of the tyres digs its way forward through the<br />

tough morass. Each pothole is deeper than the last.<br />

The path between the trees narrows, becoming more<br />

and more bumpy - a trial of strength for both the<br />

drivers’ nerves and the axles of the off -roaders. And<br />

now they have to concentrate and make sure they<br />

don’t get stuck!<br />

To date the people taking part in the XWORLD Off -<br />

Road Events have been able to enjoy such adventurous<br />

scenarios. Before the fi rst stage of the tour<br />

starts in March 2008, staff , partners and external<br />

guests will have had the opportunity to try out the<br />

qualities of the upgraded Toyota Land Cruisers far<br />

away from the road. Since this February there have<br />

been over a dozen off -road events and test drives<br />

off ering the chance to experience the XWORLD vehicles<br />

live. A comfortable interior, a powerful 173<br />

hp engine, permanent four-wheel drive and special<br />

equipment for the tour will guarantee safety and<br />

enjoyment in each car. Whether equipped with a<br />

“snorkel” for driving through water, a cable winch<br />

or GPS navigation plus altimeter – the XWORLD vehicles<br />

are not mass-produced items off the shelf but<br />

special custom vehicles designed to cope with the<br />

high demands of the diff erent stages.<br />

Testing in an opencast pit<br />

The jungle-green Toyota Land Cruiser approaches<br />

the high sand dune covered with reed in fi rst gear.<br />

The challenge: The XWORLD off -roader must force<br />

its way up the steep slope without swerving or worse<br />

still, tipping over. The damp sand slips and slides, and<br />

with it the rear of the vehicle. The wheels slowly dig<br />

themselves higher and higher in the tracks up the<br />

dune. Putting your trust in the vehicle with a tiger<br />

on its side is a real thrill. And the off -roader actually<br />

manages to negotiate the crumbling slope without<br />

diffi culty.<br />

4<br />

XWORLD Off -Road Events<br />

With a tiger on rough terrain<br />

<strong>HYDRAULIKPRESSE</strong><br />

The fi rst test drives in testing terrain were performed<br />

by Enrico Kieschnick and the XWORLD project team<br />

at the beginning of 2007. The ideal spot for this<br />

was the disused opencast mine of Meuro near<br />

Senftenberg and Großräschen in Brandenburg. On<br />

this enormous area of land the off -road vehicles<br />

showed what they could do for the fi rst time on<br />

the occasion of the <strong>HANSA</strong>-<strong>FLEX</strong> regional manager<br />

meeting in March. In the middle of October 2007<br />

it was then the turn of the trade press to try out<br />

all XWORLD automobiles in a one-day event held<br />

at the mine. Verdict: The cars can cope with the 43<br />

stages through Europe and Asia!<br />

Grey hills as far as the eye can see. Deep gashes run<br />

down the slopes. The sky-blue Toyota sporting a<br />

panoramic view of the Himalayas disappears in a<br />

cloud of coal dust as it approaches a jagged edge between<br />

boulders. It suddenly lurches forward but the<br />

passengers are safe and secure in their seat belts. The<br />

vehicle slips and rolls in the loose sand until it gets<br />

going again a few metres later on, shortly afterwards<br />

ploughing through a fi eld of grass as tall as a man at<br />

high speed.<br />

Learning how to drive off -road<br />

Thrills and a surge of adrenalin are part of every<br />

event like the obligatory splashes of mud on trousers<br />

and jacket. The spectacular off -road events<br />

are however specially designed to familiarise drivers<br />

with the handling of off -road vehicles in general<br />

and more specifi cally, with the XWORLD Toyota<br />

Land Cruisers. “When driving off -road, there’s a<br />

whole load of things to consider. Even experienced<br />

car drivers need to fi rst learn how to handle our<br />

specially equipped XWORLD vehicles,” comments<br />

project manager Enrico Kieschnick. Together with<br />

<strong>HANSA</strong>-<strong>FLEX</strong> employee Roelof Wittler, the two men<br />

already form a well-rehearsed team of instructors<br />

thank to extensive special training. They are responsible<br />

for the initial briefi ng beforehand and<br />

ISSUE DECEMBER 2007


keep an eye on drivers throughout the entire event,<br />

in some cases remaining in contact by radio. “To<br />

start with, most are impressed by the technology<br />

and size of the vehicle, but this is generally forgotten<br />

after a few laps on site and the fi rst successful<br />

manoeuvres. Afterwards, everyone is delighted at<br />

what the cars can do.”<br />

On the fi rst major test drive in May 2007 the participants<br />

set off punctually over the Alps, heading for<br />

the Balkans to attend the 5th <strong>HANSA</strong>-<strong>FLEX</strong> football<br />

tournament in Croatia. In the Tyrolean mountains<br />

the suitability of the vehicles for long-haul driving,<br />

the tyre-wheel combination and chassis tuning<br />

were put to the test. The vehicle technology managed<br />

the over 1500 km section to Split with fl ying<br />

colours. In the subsequent football tournament in<br />

the blazing sunshine the <strong>HANSA</strong>-<strong>FLEX</strong> players from<br />

Germany had to content themselves with a successful<br />

third place against the fl eet-of-foot Czechs and<br />

the home team from Croatia.<br />

Murky brackish water slops against the white sandy<br />

beaches of the little island on the driver’s door of the<br />

South Sea Land Cruiser. The curtain of reed grass<br />

parts under the light bow wave ahead of the bonnet,<br />

off ering a glimpse of the nearby bank. The off -roader<br />

continues rocking its way forward through deep furrows<br />

and underwater craters. The water level now<br />

starts to fall, and the bank is reached at long last. The<br />

passengers’ feet remain dry but reeds are still caught<br />

in the radiator grille.<br />

Until the start of the tour in March 2008 another<br />

series of diff erent off -road events and show dates<br />

are planned. Until then the XWORLD Toyota Land<br />

Cruisers will cause a stir on German roads. The detailed<br />

XWORLD brochure will give you a taste for<br />

adventure.<br />

ISSUE DECEMBER 2007<br />

Just look on www.xworld.cc or call +49 – 661 - 440<br />

77 27 70 to request your own copy. Every trip will offer<br />

its very own adventures and diff erent highlights<br />

in terms of the scenery. Certain XWORLD stages are<br />

proving very popular so you shouldn’t hesitate if<br />

you are interested in taking part.<br />

Katharina Bader<br />

PRG Werbeagentur GmbH<br />

XWORLD<br />

<strong>HYDRAULIKPRESSE</strong> 5


TEREX GMBH<br />

In the search for crude oil rising oil prices and a foreseeable<br />

scarcity of resources have now prompted the<br />

exploitation of sources which were not previously lucrative<br />

enough. One example of this is the enormous<br />

oil sand fi elds at Fort McMurray in <strong>Canada</strong>.<br />

The province of Alberta contains around one third<br />

of the world’s available stocks of oil sand, which is<br />

mined at open pits by mighty crawler excavators. It<br />

is here that North America’s largest crude oil producer<br />

Syncrude <strong>Canada</strong> Ltd. (SCL) operates three<br />

opencast mines. Gigantic RH 400 mining excavators<br />

from Terex O&K are used to extract the oil sand.<br />

Terex GmbH based at Dortmund, a successor company<br />

to O&K AG founded in 1876, has repeatedly set<br />

milestones in the development of hydraulic excavators<br />

and specialises in extraction and conveying<br />

at opencast mines. At Fort McMurray not only hydraulic<br />

but also cable-operated and bucket-wheel<br />

6<br />

Mining excavators - giants in oil sand<br />

„Works in works“ - a tried and tested concept<br />

<strong>HYDRAULIKPRESSE</strong><br />

excavators are in use. Among them is the RH 400.<br />

With an operating weight of some 1,000 tons it is<br />

the world’s largest hydraulic excavator, with jumbosized<br />

dimensions. The excavator bucket alone has a<br />

capacity of 45 cubic metres, able to handle around<br />

100 tons of oil sand in a single pass. This calls for<br />

enormous forces - something that the RH 400 can<br />

deliver thanks to an engine output of 4400 HP and<br />

hydraulics that can cope with operating pressures<br />

of up to 310 bar. Oil sand can be mined in winter<br />

at - 40 °C when the ground is frozen rock-hard, but<br />

also in summer at + 40 °C when the oil sand has<br />

become a stringy mass.<br />

The extracted oil sand is then loaded onto gigantic<br />

heavy-duty trucks with payloads of up to 360 tons,<br />

which take it away for processing, fi nally resulting<br />

in the coveted crude oil. Four buckets from a RH<br />

400 will fi ll a heavy-duty truck. The mining excava-<br />

tor is controlled from the third fl oor so to speak. It<br />

is at this level that the driver’s cab is to be found,<br />

equipped with a control panel as well as a kitchenette<br />

complete with microwave and area for relaxing.<br />

The precise control system is designed to ensure<br />

easy operation although the skill of the driver<br />

also plays a key role here. Surprisingly, women are<br />

now increasingly to be found in this job: Experience<br />

has shown that they handle their machines with<br />

greater fi nesse.<br />

Ordered at short notice, delivered<br />

promptly<br />

A new RH 400 from Terex O&K is already scheduled<br />

to go into service at one of the three oil sand deposits<br />

in Alberta in January 2008. The time scale<br />

from ordering the mining excavator from the German<br />

manufacturer to commissioning is rather<br />

tight. Nowadays the construction of such mighty<br />

“workhorses” must be performed in record time.<br />

Once a mining company has decided to exploit<br />

a new oil fi eld, it cannot wait months for delivery<br />

of the machine required. For Terex O&K as the<br />

partner to the mine operator this makes high demands<br />

on its readiness to deliver. There must be<br />

no delay in assembly under any circumstances.<br />

Terex O&K therefore expects each subsupplier to<br />

off er special services, something that naturally<br />

also applies to the manufacturers of the hydraulic<br />

connecting elements. The completed excavator is<br />

based on designs, drawings and parts lists from an<br />

existing model but this was last built by Terex O&K<br />

three years ago - mining excavators of these dimensions<br />

are not mass-produced on an assembly line.<br />

As technical progress has not stood still since then,<br />

technological advances must of course also be taken<br />

into account and incorporated during construction<br />

of the machine. This may involve new units with<br />

modifi ed connections or new routings for pipes and<br />

hose lines, which have come about from the experiences<br />

evaluated by the operator over the last few<br />

years. In such cases fi ttings need to be changed,<br />

as well as nominal widths, with pipe manifolds<br />

ISSUE DECEMBER 2007


undergoing redesign, etc. For the hydraulic hose<br />

lines alone, some 150 diff erent types are installed<br />

in the RH 400, with nominal widths ranging from<br />

4 to 204. In addition to the various pipes, the RH<br />

400 excavator also includes 900 metres of hoses,<br />

containing more than 13,000 litres of hydraulic oil.<br />

To build jumbo-sized machines like the RH 400 in<br />

record time, fast solutions are required, so making<br />

high demands on the fl exibility of the hydraulic<br />

hose line supplier due to short-term planning. And<br />

<strong>HANSA</strong>-<strong>FLEX</strong> recently took on this role.<br />

Since 1 July 2007 the hydraulics service provider<br />

from Bremen has been represented at Terex O&K<br />

with its own on-site production facility. The works<br />

in works concept used there gives <strong>HANSA</strong>-<strong>FLEX</strong> the<br />

necessary fl exibility to make changes to components<br />

at short notice whenever required.<br />

Re-orientation calls for change<br />

Cooperation between Terex O&K and <strong>HANSA</strong>-<strong>FLEX</strong><br />

came about after work was disrupted on the installation<br />

sites at Terex O&K following major increases<br />

in production which caused delays in delivery with<br />

various suppliers. The provisioning time for hose<br />

lines was to be slashed from one week to one day<br />

in order to cater for the ever-growing customer<br />

demands. Supply in its existing form was no longer<br />

suffi cient with short-term changes to components<br />

and increasingly tight delivery times for spare parts.<br />

Terex engineers Andreas Bruns and Frank Gorczak<br />

quickly made up their minds and set off to fi nd suppliers<br />

who could guarantee to deliver on the dot.<br />

The search took Andreas Bruns to <strong>HANSA</strong>-<strong>FLEX</strong>’s<br />

Oldenburg branch, where he showed a strong interest<br />

in the production of hydraulic hose lines.<br />

In their discussions it quickly became apparent to<br />

branch manager Jens Bruhn that this was a potential<br />

customer who was after fundamental solutions<br />

according to his specifi cations. He informed key<br />

account manager Matthias Henke at <strong>HANSA</strong>-<strong>FLEX</strong>’s<br />

Head Offi ce about this contact without further ado.<br />

He called Terex Lean Manager Andreas Bruns directly,<br />

and May 2006 then ushered in a period of famil-<br />

ISSUE DECEMBER 2007<br />

iarisation for the two companies. In the following<br />

weeks <strong>HANSA</strong>-<strong>FLEX</strong> teamed up with Terex O&K to<br />

draw up a concept providing for the 9,000 diff erent<br />

articles required for the hydraulic excavators in the<br />

specifi ed quality and guaranteeing 100% availability.<br />

<strong>Inc</strong>luding hose lines in various nominal widths<br />

and with a whole range of special fi ttings, stainless<br />

steel pipes for the air intake system, hoses for the<br />

air conditioning, special steel parts such as pump<br />

fl anges and pipe manifolds with unusual dimensions<br />

and geometries, screw fi ttings and mountings.<br />

A winning concept<br />

<strong>HANSA</strong>-<strong>FLEX</strong> was not only able to supply all that but<br />

also demonstrated the fl exibility and focus on service<br />

required by Terex O&K. In line with its philosophy<br />

of customer proximity <strong>HANSA</strong>-<strong>FLEX</strong> declared itself<br />

willing to set up an individual workshop for this<br />

cooperation, including a complete production line<br />

to manufacture hose lines of all dimensions at short<br />

notice on Terex O&K’s site in Dortmund, as well as<br />

a warehouse stocking the 9,000 associated article.<br />

This solution guaranteed compliance with the<br />

specifi ed delivery time of just one day: The decisive<br />

criterion for Terex O&K! With this so-called “works<br />

in works” concept <strong>HANSA</strong>-<strong>FLEX</strong> has demonstrated<br />

its readiness to fully engage with the customer’s<br />

production processes, something that of course not<br />

only calls for the willingness to run a two-shift system<br />

but also to provide direct help with assembly:<br />

On site <strong>HANSA</strong>-<strong>FLEX</strong> staff measure the dimensions<br />

of the hose lines, establish the angle of rotation for<br />

fi ttings and manufacture the parts in the shortest<br />

possible time. Keeping to their word: If delivery has<br />

been promised within three hours, it will be there<br />

in three hours!<br />

Once this fundamental willingness to cooperate<br />

had been established, everything happened very<br />

quickly.<br />

TEREX GMBH<br />

<strong>HYDRAULIKPRESSE</strong> 7


TEREX GMBH<br />

Ready to go in minimum time<br />

Ralf Vogeler, technical expert at <strong>HANSA</strong>-<strong>FLEX</strong>’s<br />

Head Offi ce, took over the responsible task of comparing<br />

all Terex specifi cations with <strong>HANSA</strong>-<strong>FLEX</strong>’s<br />

delivery programme and ensuring technically fl awless<br />

solutions. This involved analysing all available<br />

engineering drawings and parts lists as Terex O&K<br />

did not want to incur costs for new components<br />

approvals so that cooperation could get off to a<br />

smooth start. The result was impressive, and buyer<br />

Frank Gorczak was able to use these analyses to<br />

check that <strong>HANSA</strong>-<strong>FLEX</strong> fulfi lled all expectations<br />

as the supplier. “We opted for the company who<br />

off ered us the greatest certainty in terms of supply<br />

with its focus on service, product quality and avail-<br />

8<br />

<strong>HYDRAULIKPRESSE</strong><br />

ability of materials.” However, it is not only troublefree<br />

work processes that speak for <strong>HANSA</strong>-<strong>FLEX</strong>, but<br />

also certifi ed quality documented according to EN<br />

DIN ISO 9001 and by Germanischer Lloyd.<br />

To ensure that everything was prepared for the<br />

start of operations in the shortest possible time,<br />

the Sales department in Bremen took over coordination<br />

of the project, appointing Matthias<br />

Henke as project manager. Following conclusion<br />

of the contract in December 2006, the new<br />

<strong>HANSA</strong>-<strong>FLEX</strong> branch was opened in July 2007 at Terex<br />

O&K by Thomas Armerding, managing director of<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Hydraulik GmbH, and Dr. Heribert<br />

Bussmann, managing director of Terex GmbH.<br />

A lodger rigged out in red and<br />

white<br />

From this date the “works in works” concept has<br />

proved a hit. The seven <strong>HANSA</strong>-<strong>FLEX</strong> staff employed<br />

at the works are housed in a 1,300 m2 hall right<br />

next to the installation points. With the help of fi tters<br />

from ThyssenKrupp Industrieservice (TKIN) the<br />

hall was specially tailored to the requirements of<br />

<strong>HANSA</strong>-<strong>FLEX</strong>’s production processes, the machinery<br />

and electrics were installed and the entire facility<br />

of course painted in the colours of <strong>HANSA</strong>-<strong>FLEX</strong>’s<br />

Corporate Identity. The layout of the machines and<br />

storage areas was planned by key account manager<br />

Ralph Rehberger, who will in future also be<br />

in charge of other tasks such as the Cost Reduction<br />

Project in cooperation with Terex O&K. This project<br />

forms part of the contract with Terex O&K and is<br />

meant to cut procurement costs for the excavator<br />

manufacturer within 30 months.<br />

It involves for example suggestions how to optimise<br />

line engineering, e.g. by improving routings,<br />

minimising fi ttings and installation eff ort with new<br />

solutions and streamlining parts lists. The customer<br />

is free to implement the suggestions developed<br />

<strong>HANSA</strong>-<strong>FLEX</strong> as required. The advantages of having<br />

a workshop directly on the customer’s site are<br />

obvious and made themselves felt after just a few<br />

weeks. <strong>HANSA</strong>-<strong>FLEX</strong> off ers just-in-time delivery,<br />

something that is a key factor for Terex when it<br />

comes to complying with assembly times. In addition,<br />

the high level of contact on site provides scope<br />

for close cooperation. When there were design<br />

changes in the length dimensions and angles of rotation<br />

for suction line fi ttings on the world’s largest<br />

hydraulic excavator, a solution was quickly found.<br />

The staff reporting to production manager Marius<br />

Vennemann and his deputy Jörg Schulmeistrat<br />

made precise measurements of the excavator and<br />

soon afterwards the required connecting elements<br />

were ready for installation. And proved to be an<br />

exact fi t: For hose lines with the nominal width of<br />

204 there is almost no leeway for correcting errors<br />

in geometry on installation.<br />

ISSUE DECEMBER 2007


From the warehouse directly to<br />

the oil sand<br />

Stockkeeping is also in the hands of the hydraulics<br />

specialist from Bremen, so allowing Terex O&K to<br />

scale down its own supplies of hydraulic connecting<br />

elements to zero and thereby cut costs. The<br />

components required are arranged in trolleys by<br />

<strong>HANSA</strong>-<strong>FLEX</strong> so they are ready to hand for the fi tters<br />

at their individual workstations. Here the HDS<br />

high-pressure hose lines are also included in the<br />

deliveries.<br />

The close cooperation between <strong>HANSA</strong>-<strong>FLEX</strong> and<br />

Terex O&K is demonstrated every morning when<br />

a work scheduling meeting is held at Terex O&K,<br />

attended by managers from Job Planning, Procurement,<br />

Design and Quality Assurance in order<br />

to assess the level of progress at the installations<br />

points and to determine action for ensuring work<br />

continues swiftly. The members of the <strong>HANSA</strong>-<strong>FLEX</strong><br />

team are also present so are able to quickly respond<br />

ISSUE DECEMBER 2007<br />

to every requirement of Terex O&K without wasting<br />

time. The process will be optimised even further by<br />

the changeover to an electronic ordering system in<br />

2008. The paperless system will speed up the ordering<br />

process as it no longer involves manual system<br />

inputting, so ruling out incorrect delivery due to<br />

data entry errors or misunderstandings.<br />

With the works in works concept <strong>HANSA</strong>-<strong>FLEX</strong> of<br />

course also provides backup to Terex’s customer<br />

TEREX GMBH<br />

service department, which supplies the spare parts<br />

required for the mining excavators from Dortmund<br />

that are used all over the world. Mining excavators<br />

are the key links in the logistics chain for oil sand<br />

extraction and therefore have to function without<br />

interruption as far as possible. Terex O&K can now<br />

off er fast help, with backup from <strong>HANSA</strong>-<strong>FLEX</strong>’s effi<br />

cient warehouse in Dortmund.<br />

<strong>HYDRAULIKPRESSE</strong> 9


IN CONVERSATION<br />

Over 20 years of service at <strong>HANSA</strong>-<strong>FLEX</strong>, to start with<br />

at the workshop, then as a member of the fi eld team,<br />

followed by a position as branch manager. Now four<br />

years spent as regional manager for the branches<br />

of Boff zen/Höxter, Korbach, Paderborn, Blomberg,<br />

Warburg and Lemgo. Diethelm Kappe is a man who<br />

combines theory and practice to come up with customised<br />

solutions.<br />

He was recruited to the company in Boff zen by Peter<br />

Weidtkamp Senior in 1986 and initiated into the<br />

10<br />

In conversation with Diethelm Kappe<br />

„We can‘t manage without training“<br />

<strong>HYDRAULIKPRESSE</strong><br />

world of hydraulics. In 1987 the dynamic growth<br />

enjoyed by <strong>HANSA</strong>-<strong>FLEX</strong> resulted in the founding of<br />

the Paderborn branch, where Diethelm Kappe was<br />

taken on at the workshop. Branch manager Hans<br />

Lohmann quickly spotted Kappe’s suitability for<br />

work in the fi eld and encouraged him to develop<br />

these skills. In 1999 he succeeded his mentor, taking<br />

over his position as branch manager in Paderborn.<br />

He became one of the fi rst regional managers<br />

in 2003 and since 2002 has also been responsible<br />

for internal auditing at the Group’s branches. He<br />

spoke to <strong>HYDRAULIKPRESSE</strong> about his career and<br />

the future of specialist staff .<br />

: Did your time working in<br />

Boff zen leave its mark on you?<br />

Diethelm Kappe: Oh yes, I owe an awful lot to Peter<br />

Weidtkamp Senior. I was very impressed by his<br />

aspiration to run the company like a family fi rm. He<br />

motivated us all with his strategic approach combining<br />

challenge and encouragement, so ensuring<br />

growth of the Boff zen Group. Since then I know<br />

how important it is to have committed staff . In the<br />

meantime the Boff zen Group has been taken over<br />

by one of the shareholders, Peter Weidtkamp Junior,<br />

with whom I enjoy a working relationship based<br />

on partnership. And this is also the case with this<br />

sister Sabine Weidtkamp.<br />

: You have a bond with<br />

Peter Weidtkamp Junior from having worked together?<br />

Diethelm Kappe: You are speaking about my<br />

time in Niederaula. Following a period of intensive<br />

training I worked together then with Peter Weidtkamp<br />

Junior, looking after the tunnel building<br />

sites for the ICE line with a mobile workshop. We<br />

were always on hand with a well-stocked assortment<br />

of parts so spare hose lines could be supplied<br />

without delay. The customer was impressed by the<br />

fast availability and focus on service off ered by<br />

<strong>HANSA</strong>-<strong>FLEX</strong>. Here we virtually acted as pioneers,<br />

with this experience being subsequently incorporated<br />

in the concept of the <strong>HANSA</strong>-<strong>FLEX</strong> mobile<br />

service centre. Today <strong>FLEX</strong>XPRESS off ers a range<br />

of mobile services, guaranteeing fast support for<br />

customers.<br />

: This was soon followed<br />

by a stint in the fi eld team?<br />

Diethelm Kappe: In those days at Paderborn<br />

Hans Lohmann realised that I not only have a good<br />

understanding of technology and am able to get<br />

to grips with a subject but also that I know how<br />

customers’ minds work and speak their language.<br />

I enjoy working outside the offi ce, not least as this<br />

meant I received training from “old hands” such as<br />

Horst Klarholz, Werner Rode and Jürgen Marx. Their<br />

experience and tips were often a great help to me.<br />

on training?<br />

: What value do you place<br />

Diethelm Kappe: We can’t manage without<br />

training - I too received systematic encouragement<br />

and support. Today the opportunities for training<br />

within the <strong>HANSA</strong>-<strong>FLEX</strong> Group are quite diff erent.<br />

For example, courses at the training centre or at<br />

the branches, as well as product familiarisation organised<br />

by suppliers. I set great store by systematic<br />

training for all staff in my region as the continuous<br />

growth shown by <strong>HANSA</strong>-<strong>FLEX</strong> calls for the strategic<br />

cultivation of junior staff at every level.<br />

We can only play an active role in shaping the future<br />

with qualifi ed staff . In the region we have four<br />

youngsters training in the wholesale and export<br />

sector as well as in warehouse logistics. They are<br />

fully involved in processes at the individual companies,<br />

where they learn to act on their own initiative<br />

and take on board our customer and serviceoriented<br />

approach from the very outset. One great<br />

idea is <strong>HANSA</strong>-<strong>FLEX</strong>’s initiative to train a hydraulics<br />

specialist – even providing a diploma. Our workshop<br />

manager in Paderborn, Hans-Josef Denzer,<br />

is due to complete this training course in Dresden<br />

next summer (2008). This will allow all staff to take<br />

on new responsibilities in the course of their career,<br />

including abroad.<br />

ISSUE DECEMBER 2007


specialists?<br />

: Does <strong>HANSA</strong>-<strong>FLEX</strong> need<br />

Diethelm Kappe: This issue also plays a key role at<br />

the meetings of the regional managers. Further development<br />

of the system provider concept means<br />

that we are on the lookout for specialist staff . After<br />

all, we want to ensure dynamic growth in terms of<br />

personnel. Staff who were at our side from the start<br />

will slowly be retiring and need to be replaced by<br />

competent successors.<br />

: Where will future development<br />

take the Group?<br />

Diethelm Kappe: I too have experienced the<br />

transformation from a supplier of spare hose lines<br />

to a system provider for hydraulics. This concept<br />

opens up new opportunities in the market, something<br />

that can also be seen in the increased sales.<br />

Customers appreciate our focus on service, and we<br />

ISSUE DECEMBER 2007<br />

want to optimise this further. Here it is a question<br />

of opening up new markets and making systematic<br />

use of the available opportunities to off er our existing<br />

customer base reliable support. By making<br />

things easier for them - off ering everything from a<br />

single source. We must actively communicate this<br />

message, for example the planning and manufacture<br />

of units or complete hydraulic systems extending<br />

to fi tting and commissioning at customers’<br />

plants.<br />

I have also noticed a change in the approach of<br />

staff . If they were once satisfi ed with supplying<br />

the relevant spare part to the customer, they now<br />

adopt a strategic approach, drawing the customer’s<br />

attention to our services, including the supply of<br />

components or installation. And they look confi -<br />

dent when doing so as they have been trained and<br />

are thus able to off er customers profi cient advice.<br />

: And there are examples<br />

of this in your group.<br />

IN CONVERSATION<br />

Diethelm Kappe: Our off er of repairing cylinders<br />

in Boff zen means fast help for customers right away.<br />

If minor repairs are involved, for example replacing<br />

seals, this can be done in Boff zen by Andreas<br />

Meyer or Ansgar Block. More complex work is carried<br />

out in cooperation with the specialists based at<br />

<strong>HANSA</strong>-<strong>FLEX</strong>’s cylinder repair centre in Königshofen.<br />

: To what extent has<br />

X-CODE been incorporated here?<br />

Diethelm Kappe: Numerous customers are delighted<br />

about using this service module. For example,<br />

the automotive logistics company E.H. Harms<br />

in Paderborn. In the past a fi tter from Harms turned<br />

up at the branch in the morning, armed with a large<br />

box of old hose lines which needed to be replaced.<br />

Today a fax with the X-CODE numbers arrives fi rst<br />

thing. The spare hose lines are immediately manufactured<br />

to order and are ready for collection by<br />

lunchtime.<br />

Or the example of Benteler Automotive and Benteler<br />

Stahlrohr. There hose lines were subsequently<br />

marked with X-CODE on the production machines.<br />

This allows machine downtimes to be kept to an<br />

absolute minimum in the event of repair. And we<br />

even supply the spare parts to the customer using<br />

our service vehicle without any loss of time. Offering<br />

specifi c benefi t to customers: This is where<br />

<strong>HANSA</strong>-<strong>FLEX</strong> is successful.<br />

<strong>HYDRAULIKPRESSE</strong> 11


MOULDED HOSES<br />

When space is tight in machine construction,<br />

manufacturers will now immediately reach for<br />

<strong>HANSA</strong>-<strong>FLEX</strong> moulded hoses. <strong>HANSA</strong>-<strong>FLEX</strong> is rounding<br />

off its comprehensive product range with this<br />

new line: The fl uid technology system partner is now<br />

off ering moulded hoses that can be manufactured in<br />

any form, geometry and diameter and are an ideal<br />

addition to the tried and tested range of products for<br />

fl uid technology.<br />

Anyone who owns a car will know what we are talking<br />

about here: Moulded hoses are used for example<br />

to connect the radiator and the engine. And this<br />

is only one of many possible applications. Moulded<br />

hoses come in whenever pipes reach their natural<br />

limits. This is above all the case with complex installations<br />

when space is tight, calling for bending radiuses<br />

that are just not possible with pipes. In general<br />

moulded hoses can be used to join two parts<br />

together, for example, the fi lter to the transmission<br />

12<br />

Everything from one source:<br />

Moulded hoses now also available<br />

<strong>HYDRAULIKPRESSE</strong><br />

or the steering gear to the oil cooler, especially<br />

when the installation conditions call for bending<br />

radiuses that can only be achieved with moulded<br />

hoses. Such hoses can be manufactured in all forms,<br />

geometries and diameters and are suitable for use<br />

in very cramped spaces. This means that it is possible<br />

to guarantee a technically perfect installation<br />

even under diffi cult, cramped conditions, so in the<br />

end signifi cantly contributing to the wear resistance<br />

of systems.<br />

At the same time moulded hoses even out tolerances<br />

and as vibration dampers have a decoupling<br />

eff ect. They absorb vibration – for example from<br />

the engine – and so reliably prevents this from<br />

causing leakage or worse still, fractures. For this<br />

reason, such hoses are also fi tted in heavy mining<br />

excavators used at open pits. The powerful engines<br />

of these mighty vehicles, which are in non-stop<br />

operation 365 days a year, make the installation of<br />

moulded hoses absolutely essential as they absorb<br />

vibration and oscillation. <strong>HANSA</strong>-<strong>FLEX</strong> produces<br />

customised hoses to the exact specifi cations of<br />

the manufacturer. The man in charge here is Ralph<br />

Rehberger, who is the specialist responsible at<br />

<strong>HANSA</strong>-<strong>FLEX</strong> for the entire sector of moulded<br />

hoses.<br />

Individually moulded<br />

Moulded hoses can be tailor-made as an individual<br />

solution to the exact specifi cations of the customer.<br />

Something that is of advantage particularly with<br />

new designs, which generally call for individual<br />

solutions. <strong>HANSA</strong>-<strong>FLEX</strong> can off er its customers<br />

full service if required: From development of the<br />

moulded hose to sampling and transfer to serial<br />

production. If the customer does not supply the<br />

necessary space coordinates, <strong>HANSA</strong>-<strong>FLEX</strong> will also<br />

take measurements to determine the XYZ data. A<br />

moulding tool is then needed to manufacture the<br />

hose. With the data that have either been provided<br />

or measured <strong>HANSA</strong>-<strong>FLEX</strong> fi rst produces a so-called<br />

moulding mandrel made of steel or stainless steel,<br />

ISSUE DECEMBER 2007


whose geometry will create the hose geometry<br />

required. Vulcanised metal or rubber components<br />

can be incorporated or attached to realise almost<br />

any conceivable design or mounting alternatives –<br />

another advantage of moulded hoses.<br />

As moulded hoses are subject to particularly high<br />

stresses in terms of vibrations and bending loads, a<br />

long service life depends on lasting quality. For this<br />

reason <strong>HANSA</strong>-<strong>FLEX</strong> moulded hoses are produced<br />

from the material EPDM. Ethylene-propylene rubber<br />

is resistant to aqueous media and is therefore<br />

a popular choice for applications involving cooling<br />

water. This versatile material also off ers excellent<br />

resistance to ageing, weathering and ozone, and<br />

can be used in a temperature range from -50 °C to<br />

+150 °C.<br />

Basic range already in stock<br />

Besides the moulded EPDM hoses available from<br />

stock <strong>HANSA</strong>-<strong>FLEX</strong> also manufactures moulded<br />

hoses made of acrylonitrile butadiene rubber (NBR)<br />

from NBR/PVC cuttings according to the requirements.<br />

They are resistant to oil and traces of oil<br />

and are especially robust, non-ageing and fl exible<br />

as well. Chlorobutadiene rubber (CR) off ers good<br />

resistance to chemicals, ageing and ozone while<br />

acrylic-ethylene rubber (AEM) is characterised by<br />

good resistance to mineral oils, water and coolants.<br />

Epichlorohydrin rubber (ECO) has to be used<br />

for moulded hoses which need to simultaneously<br />

withstand temperatures of over 160 °C and the effect<br />

of fuels.<br />

Moulded hoses made of silicone are the choice if<br />

liquid media are to be conveyed with a high material<br />

or ambient temperature. As a fl exible material<br />

resistant to deformation they ey y w wi with wi with withstand t stand temperatures<br />

of up to 180 °C on n a a<br />

llong-term<br />

ong-term<br />

basis, and even to 250 °C for fo or r<br />

brief periods.<br />

ISSUE DECEMBER 2007<br />

With its wide range of moulded hoses <strong>HANSA</strong>-<br />

<strong>FLEX</strong> can now off er customers everything from one<br />

source. <strong>HANSA</strong>-<strong>FLEX</strong>’s warehouse at the Walldorf<br />

branch contains a basic range of all types of moulded<br />

hoses for standard applications such as coolants,<br />

ready for immediate delivery. From an internal<br />

diameter of 20 millimetres up to 78 millimetres.<br />

These robust long-lasting hoses are available from<br />

stock via all <strong>HANSA</strong>-<strong>FLEX</strong> branches.<br />

MOULDED HOSES<br />

<strong>HYDRAULIKPRESSE</strong> 13


BRANCHES<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Czech Republic was founded in Prague<br />

in 1995 with a branch based on the industrial site<br />

of Prazská strojírna A.G., which initially provided<br />

a hydraulics service for the entire region of Central<br />

Bohemia.<br />

It quickly managed to win over customers with the<br />

level of quality supplied, a well-stocked warehouse<br />

and a 24-hour service. Its clientele soon included<br />

numerous transport companies and building contractors<br />

involved in construction of the new traffi c<br />

routes and lines of Prague’s underground railway.<br />

The company then opened a second branch in<br />

Prague in 1999 with a staff of four. Today this offi<br />

ce is responsible for managing all other branches<br />

based in the Czech Republic. It is headed up by Rudolf<br />

Melc. Since 2002 <strong>HANSA</strong>-<strong>FLEX</strong>’s Czech Republic<br />

Group has also included branches in Ústí nad Labem<br />

and Liberec. The branch in Liberec, which is managed<br />

by Pavel Kovarík, is housed in the building in<br />

which the well-known car designer Porsche was<br />

14<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Czech Republic<br />

Development in fast motion<br />

<strong>HYDRAULIKPRESSE</strong><br />

born. Together with the branch in Ústí nad Labem<br />

managed by Rudolf Reichelt it is responsible for<br />

off ering service to North Bohemia. The Ústí branch<br />

was also involved in the tunnelling work for the<br />

motorway network between Prague and Dresden.<br />

Since 2003 the traditionally dynamic industrial region<br />

of Brno has been home to one of the company’s<br />

most successful branches in the Czech Republic.<br />

Here Marian Bednarík and a team of two devote<br />

themselves to the business of hydraulic components<br />

and operate as an OEM for a major exporter<br />

in the oil rig sector supplying the whole of Europe.<br />

In the region of Pilsen, which specialises in mechanical<br />

engineering, Michal Urban manages a<br />

branch founded in 2004. Besides its hydraulics service,<br />

the branch supports the international Ingersoll-<br />

Rand organisation with compressor production as<br />

original equipment. With the help of Karl- Heinz<br />

Loose from Head Offi ce in Bremen, Pilsen is responsible<br />

for supplying curved pipes, produced by<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Weixdorf.<br />

2005 saw the addition of a branch in Pardubice,<br />

which is managed by Miroslav Vencl. This region<br />

is dominated by chemicals production. Its bestknown<br />

product is Semtex, a plastic explosive for<br />

commercial blasting. The customers of the branch<br />

not only include companies from the chemicals industry<br />

but also agricultural fi rms and building contractors<br />

involved in development of<br />

the Prague - Ostrava ava<br />

rail corridor.<br />

Chodov near<br />

Karlovy Vary<br />

was the site chosen<br />

for the next<br />

branch founded<br />

in 2006. Here<br />

branch manager<br />

Zdenek Kozel<br />

was faced with<br />

the major challenge<br />

of in particuu-<br />

lar winning over customers from the mining sector<br />

in the coal basin of North Bohemia and Most.<br />

The region of Ostrava, once a centre for steel in the<br />

republic, has also shown highly dynamic growth.<br />

The demand for hydraulics services is growing<br />

there, so prompting <strong>HANSA</strong>-<strong>FLEX</strong> to open another<br />

branch there in 2007 under the management of<br />

Jirí Stanovsky. This year also saw inauguration of<br />

the tenth branch in the industrial region of Zlín,<br />

where the machine construction sector is currently<br />

undergoing regeneration. This branch is managed<br />

by Martin Panácek. The dense network of branches<br />

in the Czech Republic headed up by Jaroslav Kratochvil<br />

is now aiming to further improve the quality<br />

of services and add to this range according to the<br />

requirements of customers. The <strong>FLEX</strong>XPRESS vehicle<br />

based in Prague is set to be joined by others<br />

in these regions. New services such as X-CODE,<br />

the ISSO standard and of course constant expansion<br />

of the product range are all communicated by<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Czech Republic at exhibitions and fairs,<br />

in trade journals and - it goes without saying - by<br />

<strong>HYDRAULIKPRESSE</strong>.<br />

ISSUE DECEMBER 2007


From 2008 the night will end at 4.00 am for staff at<br />

<strong>HANSA</strong>-<strong>FLEX</strong>’s Nordhausen branch. Introduction of<br />

a two-shift system will then mean getting up early.<br />

This is the only way to cope with customer requirements.<br />

The upheaval underway in an entire region at<br />

the southern edge of the Harz mountains in the north<br />

of Thuringia is apparent.<br />

In Nordhausen branch manager Bernd Bady and his<br />

team of two staff , who will soon be backed up by<br />

the addition of two other colleagues, not only look<br />

after over 1,000 customers in the agricultural sector<br />

and industrial fi rms in the region both large and<br />

small, but act as an OEM to manufacturers known<br />

throughout Germany. One of these is Schachtbau<br />

Nordhausen GmbH, a specialist contractor with<br />

over 105 years of tradition in the techniques of mining<br />

and underground working, as well as the use of<br />

modern building methods. This company operates<br />

in the mining sector in addition to bridge building<br />

and civil engineering and is also involved in environmental<br />

technology.<br />

For centuries Thuringia has been known for the extraction<br />

of potash salt taking place in the region at<br />

ISSUE DECEMBER 2007<br />

BRANCHES<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Nordhausen branch<br />

A region undergoing upheaval<br />

depths between 600 and 1000 metres. Although in<br />

the past many potash mines have seen retreating<br />

and shutdown, the plan is to once again mine potash<br />

salt from 2009 – not least due to the increasing<br />

salt prices. With this taking place at a deposit<br />

containing at least 200 million tons of potash salt.<br />

This means that additional responsibilities are in<br />

store for <strong>HANSA</strong>-<strong>FLEX</strong> Nordhausen. For Schachtbau<br />

GmbH the branch operates as an OEM in the business<br />

area of undercarriages and upper decks for<br />

construction and mine vehicles, leaders and bodies<br />

on MAN drilling equipment.<br />

Maximator GmbH, a systems supplier for high-pressure<br />

and testing technology, hydraulics and pneumatics,<br />

also relies on support from Nordhausen.<br />

As an OEM, <strong>HANSA</strong>-<strong>FLEX</strong> ensures that the right hydraulic<br />

components go into test rigs for high-pressure<br />

applications used to check pressure, bursting,<br />

tightness and internal pressure, under the responsibility<br />

of fi eld team member Volker Weickert. Such<br />

test rigs are utilised in laboratories or R&D facilities<br />

or for quality control and incoming goods checks.<br />

<strong>HANSA</strong>-<strong>FLEX</strong>’s Nordhausen branch is currently managing<br />

a workshop container at the Höllbergtunnel<br />

building site near Bernterode on the B 80 / A 38.<br />

The customer working there has already relied for<br />

years on support from <strong>HANSA</strong>-<strong>FLEX</strong> and its dense<br />

service network at construction sites elsewhere in<br />

Germany and has benefi ted from good experience<br />

with the company. So it was a matter of course<br />

that the nearest branch at Nordhausen should be<br />

in charge of the workshop container at the tunnel<br />

building site in Thuringia. Works manager Bernd<br />

Bady and Volker Weickert are responsible for ensuring<br />

that this mobile container, which is relocated<br />

along with the tunnel building site, is adequately<br />

stocked with the spare hydraulic parts required on<br />

site at all times.<br />

The customer structure of the Nordhausen<br />

branch means that it has to call on the services of<br />

<strong>HANSA</strong>-<strong>FLEX</strong>’s special centres of competence time<br />

and time again when special hydraulic components<br />

or special pipes and fi ttings are needed. And when<br />

it is a question of sealing technology, unit manufacturing<br />

or plant engineering, the team from Nordhausen<br />

are happy to frequently call on the services<br />

and full range of benefi ts off ered by <strong>HANSA</strong>-<strong>FLEX</strong>’s<br />

numerous centres of competence. For example, the<br />

manufacture of hydraulic units required by Schachtbau<br />

Nordhausen for the off shore sector.<br />

<strong>HYDRAULIKPRESSE</strong> 15


MAGAZINER<br />

The logistics sector is booming, and globalisation is<br />

resulting in cargo handling that is not only showing<br />

continuous growth but also has to take place at<br />

ever-increasing speed. International trade is thriving,<br />

something that mainly benefi ts the stock management<br />

sector. Here acceleration of the processes involved<br />

calls for sophisticated storage systems, which<br />

need to fi t together smoothly in the interaction between<br />

rack and truck.<br />

16<br />

Getting to the top with Magaziner<br />

Adaptation of high-lift trucks<br />

<strong>HYDRAULIKPRESSE</strong><br />

This in particular applies to the latest high-rack<br />

warehouses with picking facilities, making use<br />

of special trucks. Magaziner GmbH, which was<br />

founded in 1975 and is managed by the owners as<br />

a family fi rm, specialises in the development, design<br />

and manufacture of combi narrow-aisle trucks.<br />

Magaziner originally made these industrial trucks<br />

– as they are offi cially known – for the brands<br />

Lansing and Linde: very stable and reliable vehicles<br />

featuring fl exible narrow-aisle technology. These<br />

special industrial trucks are characterised by their<br />

individual manufacture. “This means that we can<br />

specially tailor this equipment to the specifi c features<br />

of the customer’s warehouse”, enthuses Magaziner<br />

sales manager Hans-Jürgen Ebsen. While the<br />

competition frequently only off ers product versions<br />

in four sizes, Magaziner can supply overall widths<br />

ranging from 1,000 to 2,600 millimetres - in other<br />

words, especially narrow or wide vehicles, which<br />

with a length of 2,850 millimetres can also be extremely<br />

short and manoeuvrable. With this size<br />

the industrial trucks can be closely adapted to their<br />

subsequent application in terms of the design in<br />

increments of one centimetre – so allowing them<br />

to work equally well in narrow-aisle warehouses<br />

as in halls with large widths for bulky products.<br />

The adaptability of these trucks is of advantage to<br />

the operators of warehouses in the service sector in<br />

order to optimise quiet running and ensure ergonomic<br />

design for picking.<br />

An ideal combination<br />

Such variable adaptation is a convincing reason for<br />

customers to use this equipment. Magaziner only<br />

recently received a major order from a car manufacturer<br />

which ordered 70 trucks for the company’s<br />

logistics system. The enquiry involved narrow-aisle<br />

combi trucks as the manufacturer was already using<br />

picking equipment manned by a driver who<br />

rides up with the pallet to the storage location and<br />

can remove or transfer the goods to stock by hand<br />

as appropriate. This procedure not only brings ergonomic<br />

benefi ts for staff but also more eff ective utilisation<br />

of the space in the high-rise rack as pallets<br />

can be precisely positioned by operators.<br />

Where once there was often only room for three<br />

pallets because visibility from the ground was no<br />

longer very good at heights from six metres, the<br />

driver riding up with the truck can now store four<br />

pallets, so making better use of the capacities available.<br />

It is also easier to remove individual items<br />

from the pallets, also simplifying picking.<br />

ISSUE DECEMBER 2007


Narrow-aisle technology with so-called man-down<br />

trucks has been around for a long time – here the<br />

truck driver remains on the ground. In 1973 Magaziner<br />

was one of the fi rst manufacturers to combine<br />

the two systems including their respective benefi ts<br />

following joint discussions and planning with the<br />

customer in question. Particularly in the fi eld of<br />

automotive engineering the conveyance of parts of<br />

course needs to function smoothly, both in the case<br />

of complete pallets and individual components.<br />

The combi trucks are equipped as standard with a<br />

spacious and comfortable cab, which makes picking<br />

easier thanks to the narrow front railing.<br />

With annual sales fi gures of 250 narrow-aisle trucks,<br />

Magaziner has a market share of 25 percent in this<br />

sector and has become one of the key manufacturers<br />

of such special-purpose vehicles. Magaziner is<br />

the only company to build such combi trucks with<br />

a lift height of max. 17 metres and capacities of up<br />

to 2 tons. Such narrow-aisle trucks are even used<br />

in refrigerated warehouses storing foodstuff s such<br />

as fi sh, meat and frozen vegetables. Here trucks<br />

not only have to cope with a lift height of 17 metres<br />

- the temperatures of -30 °C also occurring in<br />

cold stores make high demands on the operational<br />

readiness of equipment. A true challenge for every<br />

truck.<br />

Truck masts are optimised by means of computerised<br />

design, so making them very lightweight<br />

with excellent visibility. The truck’s overall centre of<br />

gravity is set low to ensure that the vehicle is characterised<br />

by outstanding stability. Another important<br />

feature is a low mast weight as this is a basic<br />

requirement for high performance and low energy<br />

consumption. This means that complex electrical<br />

systems to stabilise equipment are basically not<br />

required in Magaziner trucks.<br />

Equipped for every application<br />

Magaziner is currently working on a special design<br />

for a combi truck that is to be used at a furniture<br />

logistics warehouse. As exhaust gases are to be<br />

avoided at this facility for reasons of hygiene and<br />

ISSUE DECEMBER 2007<br />

to protect the health of the people working there,<br />

Magaziner is designing its trucks as electric vehicles.<br />

It even off ers special-purpose industrial trucks<br />

in a version designed for explosive gas atmospheres<br />

in the chemicals industry.<br />

As Magaziner only sells to dealers, it receives its<br />

orders from their customers. They give the dealer<br />

specifi cations e.g. for the pallet size and fi lling<br />

height as well as the dimensions of the hall, asking<br />

the dealer to arrange for the maximum number<br />

of storage locations and to ensure they provide for<br />

fast handling. Magaziner then advises dealers according<br />

to these customer specifi cations, helping<br />

them to determine all parameters and translate<br />

them into an optimum design. g<br />

As a subsupplier <strong>HANSA</strong>-<strong>FLEX</strong> <strong>FLEX</strong> is naturally also dependent<br />

on this individual alconstruction procedure for trucks. s. Like its<br />

customers, Magaziner expects pects fast<br />

ability to deliver and makes es special<br />

demands on the hydraulics cs serviceprovider.<br />

With individual machines<br />

this of course also includes s advising<br />

on optimum design of the e line engineering.<br />

The timescales allowed for orproduction from placement of an n order<br />

to commissioning of a material<br />

handling vehicle are becoming coming<br />

ever shorter: A fast response onse is<br />

what is needed in the booming ooming<br />

logistics sector. <strong>HANSA</strong>-<strong>FLEX</strong>’s A-<strong>FLEX</strong>’s<br />

Hanover branch staff ed by y manager<br />

Carsten Daumen and his team eam has been in charge of<br />

Magaziner for almost 30 years ears and are used to providing<br />

the customer with extensive support. They<br />

ensure the immediate delivery ivery of hose lines ready<br />

for installation together with ith mountings. Although<br />

Magaziner has its own machines achines for in-house pro- production<br />

of hoses, <strong>HANSA</strong>-<strong>FLEX</strong> <strong>FLEX</strong> nevertheless also<br />

supplies it with the complete mplete hose material<br />

required.<br />

MAGAZINER<br />

<strong>HYDRAULIKPRESSE</strong> 17


<strong>HANSA</strong>-<strong>FLEX</strong> SWITZERLAND<br />

<strong>Hydraulics</strong> service by helicopter<br />

From a commercial enterprise to a strong partner<br />

The new name now makes plain what was clear to<br />

many customers long ago: <strong>HANSA</strong>-<strong>FLEX</strong> AG has become<br />

a high-powered hydraulics partner – for this<br />

reason it was offi cially named <strong>HANSA</strong>-<strong>FLEX</strong> Hydraulik<br />

AG in August 2007.<br />

Under the committed management of Paul Rentsch<br />

the former <strong>HANSA</strong>-<strong>FLEX</strong> AG has transformed itself<br />

from a commercial enterprise with hose line preassembly<br />

to a global hydraulics supplier. “And we also<br />

18<br />

<strong>HYDRAULIKPRESSE</strong><br />

express this with our change in name”, comments<br />

managing director Paul Rentsch. This transformation<br />

coincides with the off er of additional services.<br />

Here <strong>HANSA</strong>-<strong>FLEX</strong>’s fi tting team has already<br />

proved its worth under the toughest conditions,<br />

managing to successfully install and commission<br />

impressive hydraulic systems. For example, on the<br />

Sedrun site at the Gotthard Base Tunnel, where<br />

<strong>HANSA</strong>-<strong>FLEX</strong> was instructed by Marti-Technik AG to<br />

fi t and start up the hydraulic systems on concrete<br />

formwork carriages. When concreting the two tunnel<br />

sections, each with a diameter of around nine<br />

metres, a nozzle rotates around the longitudinal<br />

axis of the tunnel drilling machine and sprays the<br />

enclosed section with concrete. Here the resulting<br />

inner shell has to be as smooth as possible to allow<br />

the trains to subsequently travel through the<br />

tunnel at high speeds. Work at the Gotthard Tunnel<br />

is by no means an easy matter for <strong>HANSA</strong>-<strong>FLEX</strong>’s fi tters<br />

as the driving points can only be reached via an<br />

ISSUE DECEMBER 2007


access gallery some one kilometre metre<br />

in length. This means that<br />

every single component has to o<br />

be lowered from 1,300 metres es<br />

above sea level down to the he<br />

track height of 500 metres using ing<br />

an enormous lift. It must be possible<br />

to dismantle each machine ne so<br />

it will fi t into the lift. The logistics gistics<br />

have to be right as well. If a tool ool or<br />

screw fi tting has been forgotten, otten,<br />

this means going up to get and d coming<br />

back – something that takes kes up to<br />

two hours each time. And the last lift is<br />

at 10.00 pm.<br />

Our team of fi tters therefore turned up with a<br />

10-foot container and 1,500 metres of KP213 hose<br />

complete with swage nipples and screwed connections.<br />

In the tunnel the hose lines ines were measured<br />

up, preassembled and installed, d, followed by commissioning<br />

of the formwork system. Work that<br />

<strong>HANSA</strong>-<strong>FLEX</strong>’s fi tters have already eady carried out on<br />

several building sites, installing ing in total almost almost<br />

9,000 metres of hose line. Several eral hundred metres<br />

of piping were fi tted to the full ll satisfaction of the<br />

customer when <strong>HANSA</strong>-<strong>FLEX</strong>’s X’s hydraulics service<br />

was asked to modify / replace place the production<br />

equipment at Jansen Röhrenwerke. erke.<br />

When the mountain calls for<br />

<strong>FLEX</strong>XPRESS<br />

<strong>FLEX</strong>XPRESS has also been successfully introduced<br />

as a service in Switzerland, with the mobile hydraulics<br />

service fl ying into the mountains by helicopter if<br />

there is no other alternative. With the mobile workshops<br />

the service technicians have repaired many a<br />

hose line on the spot, so reducing downtimes and<br />

avoiding any loss of production.<br />

ISSUE DECEMBER 2007<br />

Here X-<br />

CODE naturally<br />

also<br />

contributed<br />

to clear identifi<br />

cation of spare<br />

parts. The The benefi ts<br />

of the coding system system<br />

when working in the<br />

Gotthard Tunnel need no<br />

special mention. HAN-<br />

SA-<strong>FLEX</strong> has recently<br />

started off ering its Swiss<br />

customers other services<br />

such as the inspection<br />

and maintenance<br />

of hydraulic systems, including<br />

oil treatment. A<br />

service that is of particular<br />

interest to customers<br />

with decentralised, regional<br />

production sites.<br />

<strong>HANSA</strong>-FLE X SWITZERLAND<br />

<strong>HYDRAULIKPRESSE</strong> 19


TRAINING CENTER<br />

In hydraulic systems the hydraulic fl uid or pressure<br />

medium is a decisive factor in determining whether<br />

a hydraulic system operates reliably and achieves a<br />

long service life. The use of fl uids in hydraulic installations<br />

calls for enormous knowledge and care. With<br />

the course subject “Hydraulic Fluids” <strong>HANSA</strong>-<strong>FLEX</strong> is<br />

helping to make customer customers<br />

more aware of how to<br />

handle hydraulic hydrauli<br />

fl uids.<br />

20<br />

Oil treatment made easy<br />

An ABC: Which hydraulic fl uid is right?<br />

<strong>HYDRAULIKPRESSE</strong><br />

<strong>HANSA</strong>-<strong>FLEX</strong>’s training manager Ulrich Hielscher<br />

points out time and time again how serious the<br />

consequences may be if customers use the wrong<br />

fl uids and mixtures of fl uids, or oils which are of<br />

inferior quality or do not comply with the specifi c<br />

operational requirements. “This may even cause the<br />

hydraulic system to fail.” That is why it is essential to<br />

select the right hydraulic fl uid. “Here it is the fi eld of<br />

application that decides - in other words, whether<br />

the system will be used for example for automotive<br />

engineering, in a press or smelting works and rolling<br />

mill; whether it is special-purpose equipment<br />

or a mobile work machine. The maximum operating<br />

pressure also plays a role, as does the ambient<br />

temperature and installation location.” No hydraulic<br />

fl uid is suitable for every application. These oils are<br />

just as varied as their possible uses. Many manufacturers<br />

of branded products clearly state what specifi<br />

cations an oil has to fulfi l for their equipment. “It<br />

is important to know in practical terms that the DIN<br />

standards for hydraulic fl uids only represent the<br />

minimum requirements for manufacturers and operators<br />

and are no longer suffi cient for most applications.<br />

For many plant and mechanical engineering<br />

companies the standard is merely the lowest<br />

level here”, explains Ulrich Hielscher. If an oil does<br />

not meet the manufacturer’s specifi cations, this<br />

may invalidate the warranty. If oils specifi ed with<br />

key performance data are approved by the manufacturer,<br />

the warranty may extend for two years,<br />

and if oils which are specifi cally named and have<br />

been fi eld-tested by the machine manufacturer are<br />

used, the warranty may even be for three years.<br />

Fluid under pressure<br />

When deciding which oil to use, it is a good idea to<br />

take a look at the technical data sheets provided by<br />

the oil supplier. They give the main characteristics<br />

of the oil, for example, the air release capability or<br />

ageing behaviour and its viscosity level. To play it<br />

safe, these data from the oil supplier and the manufacturer’s<br />

specifi cations should always be compared<br />

when selecting the type of oil.<br />

The viscosity does not characterise the quality of<br />

the hydraulic fl uid but indicates how it will behave<br />

at a certain reference temperature. In order to<br />

observe the limits on the use of a hydraulic fl uid,<br />

it is important to take account of the permitted<br />

minimum and maximum viscosity values given by<br />

the manufacturer of the hydro components. The<br />

viscosity of a hydraulic fl uid should not vary widely<br />

with fl uctuations in temperature or there will be<br />

a change in the volume fl ow rates at the throttle<br />

points. In terms of design it is also necessary to look<br />

at the critical range as on start-up, the oil in a machine<br />

should not be too viscous or there is the risk<br />

of it not reaching certain lubricating points quickly<br />

enough. However, once the operating temperature<br />

is achieved, the oil should not be too thin either or<br />

rubbing wear will not be adequately prevented.<br />

Hydraulic fl uids with a high viscosity index are<br />

mainly required for applications subject to wide<br />

fl uctuations in temperature, such as mobile work<br />

machines, vehicles or aircraft.<br />

ISSUE DECEMBER 2007


Maintenance costs money –<br />

repair costs more<br />

Hydraulic installations require precise lubrication<br />

if all components are to be properly controlled<br />

and to ensure smooth operation. In such systems<br />

large volumes fl ow through small spaces under<br />

high pressure. During this process tiny particles<br />

of dirt form a fi ne “grinding paste”, which causes<br />

wear through abrasion. Friction must be reduced<br />

between cylinders and lift rods. Most hydraulic<br />

components move on a very thin fi lm of oil,<br />

which cannot be seen with the naked eye. This<br />

guarantee smooth functioning of the machine.<br />

But only without friction when the oil is absolutely<br />

clean, something that in practice is virtually impossible<br />

– in Ulrich Hielscher’s experience. “Firstly, oil<br />

is always subject to ageing in service. Temperatures<br />

that are too high and too much air in the system<br />

ISSUE DECEMBER 2007<br />

will w cause it to oxidise. Secondly, water can get in as<br />

condensation, and abrasion on hose lines (elastomers)<br />

and pistons or cylinders does not fail to leave its<br />

mark.” Experience has shown that 75 percent of all<br />

hydraulic fl uids in hydraulic systems are not clean,<br />

with w increasing levels of soiling reducing effi ciency<br />

and a the service life of components. The result is unintentional<br />

stoppages along with high costs.<br />

This T is why the right oil treatment is a decisive<br />

factor. f Here Ulrich Hielscher refers <strong>HANSA</strong>-<strong>FLEX</strong><br />

customers to the <strong>FLEX</strong>XPRESS Fluid Service, which<br />

off ers machine operators the option of putting the<br />

responsible task of oil treatment in the hands of capable<br />

specialists. They can quickly make an accurate<br />

and a informative analysis of the oil status for every<br />

machine and submit individual suggestions for optimisation.<br />

t<br />

Thanks to our cooperation with the oil<br />

laboratory WEARCHECK, which is s not linked to any<br />

manufacturer, the result of an oil l check is available<br />

within w 36 hours. This can then be used to draw up<br />

an a action plan, extending from simple fi ltration of<br />

the t oil using the partial fl ow method thod to a complete<br />

oil change.<br />

Buying oil is a matter r of trust<br />

But things do not just end with selection election of<br />

the right oil and its treatment. “Buying<br />

oil is a matter of trust”, emphasises ses Ulrich<br />

Hielscher in his training courses. rses.<br />

A responsible supplier documents ents<br />

his oil deliveries with a technical cal<br />

data sheet and also provides in- n-<br />

formation about his quality as-<br />

surance procedure between the e<br />

refi nery and oil storage facility.<br />

If an oil has not been stored<br />

properly and has already taken<br />

up water, this will of course immediately<br />

impair its properties,<br />

possibly leading to complete<br />

failure of the machine. “Experience<br />

has shown that even new<br />

oils are often delivered heavily<br />

soiled. “For this reason I can<br />

TRAINING CENTER<br />

only recommend”, comments Ulrich Hielscher, “decontaminating<br />

oil using a partial fl ow fi lter system<br />

before fi lling the installation.” This also forms part<br />

of responsible oil treatment!<br />

The <strong>HANSA</strong>-<strong>FLEX</strong> Fluid Service (Tel. 0800 77 12345)<br />

is the simplest route to eff ective oil treatment. It<br />

consists of specialist services ranging from help<br />

with “water in the oil” to a changeover to bio-oil.<br />

The <strong>FLEX</strong>XPRESS fl eet is being gradually fi tted out<br />

with the mobile equipment for the Fluid Service. 30<br />

vehicles currently have such equipment on board in<br />

order to help customers with analysis of their fl uids<br />

and conditioning using the partial fl ow method.<br />

These systems can also be hired by <strong>HANSA</strong>-<strong>FLEX</strong><br />

customers from an equipment pool if they want to<br />

perform oil decontamination themselves.<br />

<strong>HYDRAULIKPRESSE</strong> 21


WILLMANN<br />

On 1 January 2006 <strong>HANSA</strong>-<strong>FLEX</strong> Hydraulik GmbH<br />

took over the shares of Willmann Steuerungstechnik<br />

GmbH. A change in management is now scheduled<br />

for the beginning of 2008.<br />

With the sale of Willmann Steuerungstechnik<br />

GmbH to <strong>HANSA</strong>-<strong>FLEX</strong> Hydraulik GmbH, Wolfgang<br />

Willmann has taken a strategic decision for the future,<br />

designed to ensure the continuity of his company<br />

and so safeguard service for customers on a<br />

long-term basis.<br />

A long-term approach was at issue here, particularly<br />

as regards hydraulic steel construction, a speciality<br />

of Willmann Steuerungstechnik. This sector<br />

had in recent years already been under the control<br />

of Stephan Kallage, who remains at the company in<br />

a management role. This means that the company<br />

22<br />

20 successful years in the hydraulics sector<br />

Change in management at Willmann<br />

<strong>HYDRAULIKPRESSE</strong><br />

will not have to do without his specialist knowledge,<br />

so safeguarding company operations in terms<br />

of ongoing and new projects. The chances of success<br />

for two forthcoming hydraulic steel construction<br />

projects look very promising at the moment.<br />

Wolfgang Willmann was anxious to maintain direct<br />

contact with customers as fast technical assistance<br />

and personal support remain the bywords of the<br />

company. At the special request of <strong>HANSA</strong>-<strong>FLEX</strong><br />

Hydraulik GmbH he initially continued to act as<br />

managing director in particular to arrange for his<br />

successor at the company and to ensure a smooth<br />

handover.<br />

This has now taken place. The fate of Willmann<br />

Steuerungstechnik GmbH is now in the hands of<br />

Stephan Kallage and Martin Brinkmann. Stephan<br />

Kallage takes over as technical director, while Martin<br />

Brinkmann is in charge of commercial management.<br />

In the fi eld Eilt Poppen will be playing an important<br />

role in account management and customer<br />

acquisition, so rounding off the team at Willmann<br />

Steuerungstechnik GmbH.<br />

“Expertise in <strong>Hydraulics</strong>” – Willmann Steuerungstechnik<br />

is set to live up to this claim in future. This<br />

is the challenge taken on board by the new team.<br />

With the technical know-how and experience of all<br />

staff the company will continue to satisfy the expectations<br />

of its customers to their full satisfaction.<br />

ISSUE DECEMBER 2007


Just answer the question correctly and an iPod nano 8 GB could be yours!<br />

Mail your entries to ma@hansa-fl ex.com or post them<br />

to <strong>HANSA</strong>-<strong>FLEX</strong> Hydraulik GmbH, Marketing Department,<br />

Zum Panrepel 44, 28307 Bremen, Germany. Please include<br />

your name and address. Entry deadline: 23rd of January<br />

2008. Only one entry per participant. Any recourse to legal<br />

action and any liability shall be excluded to the extent<br />

permitted by law. The prize may not be paid out in cash.<br />

Read in the following issue...<br />

02/08<br />

Openings<br />

October<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Sp. z.o.o. Ul. Kwiatkowskiego 1 37-450 Stalowa Wola Poland<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Hidraulika d.o.o. Sarajevska 2 18000 Niš Serbia<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Hydraulic Ltd. 135/2 Moo 7, Bann Krua Road 18240 Amphoe Chaloem Phra Kiat Thailand<br />

November<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Hydraulic Co. Ltd. Unit 3.5/F., Far East Consortium Bui Hongkong Hongkong<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Bulgaria Ltd. Kuklensko Schosse No.21 4004 Plovdiv Bulgaria<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Hydraulik GmbH Havelstr. 12-14 24539 Neumünster Germany<br />

December<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Hydraulik GmbH Am Surbach 10 35625 Hüttenberg-Rechtenbach Germany<br />

ISSUE DECEMBER 2007<br />

Anniversary<br />

iPod Nano, 8 GB (up to 2000 tracks), colour: black or<br />

silver; incl. earbud headphones, USB 2.0 cable, dock<br />

adapter, Software iTunes for Mac & Windows; requirements<br />

PC: USB 2.0, Windows XP Home or Professional<br />

Service Pack 2 (or newer), iTunes 7.4; requirements Mac:<br />

USB 2.0, MAC OS X 10.4.8 or newer; (actual product may<br />

diff er from displayed image)<br />

December 2007: <strong>HANSA</strong>-<strong>FLEX</strong> Elsterweda 10 years<br />

January 2008: <strong>HANSA</strong>-<strong>FLEX</strong> Barleben 10 years<br />

<strong>HANSA</strong>-<strong>FLEX</strong> Zwenkau 10 years<br />

XWORLD ADVENTURE 2008/2009 Preparations for the start in Bremen<br />

In conversation with … Regional manager Thorsten Hellmann<br />

Special vehicle construction Stokota off ers winning new concepts<br />

Training centre All oil is not the same<br />

Industrial hoses A new range for the sea water sector<br />

Oil service Improving machine availability, cutting costs<br />

FACTS & FIGURES | PREVIEW<br />

Win an iPod nano!<br />

After what time is the result of an oil<br />

sample by WEARCHECK available?<br />

A: 24 hrs<br />

B: 36 hrs<br />

C: 48 hrs<br />

Correct answer issue 10/07:<br />

B: Suak Nie, C. Seidel, Dortmund<br />

Facts & Figures<br />

Gesamt<br />

316<br />

165<br />

Preview<br />

Deutschland<br />

175<br />

91<br />

Copy deadline: 25th of January 2008<br />

<strong>HYDRAULIKPRESSE</strong><br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!