- Page 1:
Lough Gur Environmental Management
- Page 4 and 5:
Contents 1. Introduction 1.1 The Ma
- Page 7 and 8:
Section 1 Introduction 1.1 The Mana
- Page 9 and 10:
1.3 Locational Context Lough Gur is
- Page 12 and 13:
Lough Gur Environmental Management
- Page 14 and 15:
6 Given the limited area of accessi
- Page 16 and 17:
8 Shannon Region Visitor Attraction
- Page 18 and 19:
10 The Ballyhoura Attractions Clust
- Page 20 and 21:
12 SACs are administered by the Nat
- Page 22 and 23:
14 Clara Bog Clonmacnoise Outstandi
- Page 24 and 25:
16 The Inscription Process The nomi
- Page 27 and 28:
Section 3 Landscape Appraisal 3.1 L
- Page 29 and 30:
There are numerous rock outcrops an
- Page 31 and 32:
3.2 Visual Characteristics The visu
- Page 33:
Lough Gur E nvironmental Management
- Page 36 and 37:
24 The Planning Authority will exer
- Page 38 and 39:
26 The Architectural Conservation A
- Page 40 and 41:
28 One-Off Rural Houses - Permissio
- Page 42 and 43:
30 It will be essential that all ne
- Page 45 and 46:
Section 5 Archaeology 5.1 Backgroun
- Page 47 and 48:
Location of known Archaeological Si
- Page 49 and 50:
View from the summit of Carraig Ail
- Page 51 and 52:
Bourchier’s Castle Castle Farm an
- Page 53 and 54:
Sites of known Archaeological or Hi
- Page 55 and 56:
Sites in County Council Ownership i
- Page 57:
Lough Gur E nvironmental Management
- Page 60 and 61:
44 6.2 Ecology (Flora and Fauna) Su
- Page 62 and 63:
46 Gearóid Island showing a transi
- Page 64 and 65:
48 Wet willow-alder-ash woodland th
- Page 66 and 67:
50 An open pool of water grades int
- Page 68 and 69:
52 Habitat Map 2 Lough Gur Environm
- Page 70 and 71:
54 and G. Hunt, personal communicat
- Page 72 and 73:
56 enacted 1983) was instigated to
- Page 74 and 75:
58 6.10 Recommendations The followi
- Page 76 and 77:
60 Sensitive Habitats and Proposed
- Page 79 and 80:
Section 7 Water Quality 7.1 Existin
- Page 81 and 82:
Assessment of Results The organic l
- Page 83 and 84:
Bedrock map of Lough Gur catchment
- Page 85 and 86:
OR • A treatment system other tha
- Page 87 and 88: It should be pointed out that of th
- Page 89 and 90: The average concentration of total
- Page 91: Lough Gur E nvironmental Management
- Page 94 and 95: 74 There are no accurate figures fo
- Page 96 and 97: 76 Lough Gur Visitor Centre Althoug
- Page 98 and 99: 78 The Lough Gur & District Histori
- Page 100 and 101: 80 8.6 Recommendations The more arc
- Page 103 and 104: Section 9 Management Framework Over
- Page 105 and 106: In this context it is proposed to e
- Page 107 and 108: At the regional level, Lough Gur, t
- Page 109 and 110: Although there is a presumption aga
- Page 111 and 112: 9.7.5 Securing of management agreem
- Page 113 and 114: 9.8.11 Assess the likely bat fauna
- Page 115 and 116: Actions 9.10.1 To work with Shannon
- Page 117: Lough Gur E nvironmental Management
- Page 120 and 121: 96 10.2 Current Projects Trail 1: T
- Page 122 and 123: 98 Phase 2 Projects Phase 2 compris
- Page 124 and 125: 100 The lakeside parking consisted
- Page 126 and 127: 102 10.3 Signage and Interpretation
- Page 128 and 129: 104 Directional Signage Regulatory
- Page 130 and 131: 10.7 Future Projects The following
- Page 132 and 133: Trail 4: Southern Shore and 4a: Kno
- Page 134 and 135: Main Activity Areas Three ‘Activi
- Page 136 and 137: 112 Activity Area 2: Concept Propos
- Page 141 and 142: Section 11: Summary of Strategy Act
- Page 143 and 144: Section 11: Summary of Strategy Act
- Page 145 and 146: Section 11: Summary of Strategy Act
- Page 147: Lough Gur E nvironmental Management
- Page 150 and 151: Lough Gur Environmental Management
- Page 152 and 153: Lough Gur Environmental Management
- Page 154: Lough Gur Environmental Management